Wind power plant, Texas
Mesteno wind power plant, Texas
Mesteno is a 202 MW wind power plant in Starr County, Texas, operated by Deriva Energy, and it generated 609,873 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 56th percentile of U.S. wind plants. By 2025 generation it ranks 1,114th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Mesteno plant run compared with other wind plants?
The Mesteno plant had a capacity factor of 35% in 2025 on 200 MW of net summer capacity, the 56th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 127 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Mesteno | 35% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Mesteno plant generating more or less than last year?
Generation at Mesteno rose 32.6% from 2024 to 2025, from 460,065 MWh to 609,873 MWh. Through August 2026 it is running 6.8% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 460,065 |
| 2025 | 609,873 |
| 2026 through August | 487,932 |
| 2025, same months | 456,784 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 66,905 |
| July 2026 | 83,665 |
| June 2026 | 65,264 |
| May 2026 | 53,007 |
| April 2026 | 59,675 |
| March 2026 | 77,847 |
| February 2026 | 35,545 |
| January 2026 | 46,024 |
| December 2025 | 35,630 |
| November 2025 | 53,195 |
| October 2025 | 35,575 |
| September 2025 | 28,689 |
| August 2025 | 47,620 |
| July 2025 | 76,787 |
| June 2025 | 60,097 |
| May 2025 | 52,869 |
| April 2025 | 61,595 |
| March 2025 | 64,829 |
| February 2025 | 48,645 |
| January 2025 | 44,342 |
| December 2024 | 43,726 |
| November 2024 | 38,969 |
| October 2024 | 34,278 |
| September 2024 | 30,578 |
| August 2024 | 38,906 |
| July 2024 | 36,990 |
| June 2024 | 40,840 |
| May 2024 | 46,450 |
| April 2024 | 45,393 |
| March 2024 | 41,099 |
| February 2024 | 27,271 |
| January 2024 | 35,565 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Mesteno plant, and when do they retire?
1 operable generator totals 202 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 202 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| MES | Operating | Onshore Wind Turbine | 202 | 2019 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Mesteno plant?
Mesteno Wind is the only joint owner reported for Mesteno, with 100.0%. Deriva Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Mesteno plant?
Mesteno is in Rio Grande City, Starr County, Texas, at 26.5237° N, 98.7455° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Mesteno's 202 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Penascal Wind Power LLC | Kenedy | 202 | 297,617 |
| Penascal II Wind Project LLC | Kenedy | 202 | 286,270 |
| Los Vientos Wind 1B | Cameron | 202 | 370,330 |
| Mesteno | Starr | 202 | 609,873 |
| Las Lomas Wind Project | Zapata | 202 | 582,906 |
| Stella Wind Farm | Kenedy | 201 | 588,614 |
| Diversion Wind Energy LLC | Baylor | 201 | 726,660 |
Source: EIA Forms EIA-860 and EIA-923, 2025.