Skip to main content
RateWatt

Natural gas power plant, Florida

Brandy Branch natural gas power plant, Florida

Brandy Branch is a 783 MW natural gas power plant in Duval County, Florida, operated by Jea, and it generated 4,985,794 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.9% of the generation reported in Florida, and its capacity factor sits at the 91st percentile of U.S. natural gas plants. By 2025 generation it ranks 220th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

783 MWNameplate capacity
77%Capacity factor, 2025, 91st percentile, on 743 MW net summer
1.9%Of FL generation, 2025
23 yearsAverage generator age, by MW

How hard does the Brandy Branch plant run compared with other natural gas plants?

The Brandy Branch plant had a capacity factor of 77% in 2025 on 743 MW of net summer capacity, the 91st percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 279 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Brandy Branch77%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Brandy Branch plant generating more or less than last year?

Generation at Brandy Branch fell 4.4% from 2024 to 2025, from 5,215,345 MWh to 4,985,794 MWh. Through August 2026 it is running 4.5% behind the same months of 2025.

Net generation by period
PeriodMWh
20245,215,345
20254,985,794
2026 through August3,118,524
2025, same months3,264,530
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026335,842
July 2026399,979
June 2026423,864
May 2026434,982
April 2026382,870
March 2026331,717
February 2026384,180
January 2026425,090
December 2025444,638
November 2025420,825
October 2025420,810
September 2025434,991
August 2025440,048
July 2025453,508
June 2025416,430
May 2025440,856
April 2025432,313
March 2025270,173
February 2025408,646
January 2025402,556
December 2024467,157
November 2024479,051
October 2024455,333
September 2024448,274
August 2024459,055
July 2024469,781
June 2024450,740
May 2024440,809
April 2024221,862
March 2024441,048
February 2024423,321
January 2024458,914

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Brandy Branch plant?

Brandy Branch made 1.9% of the 267,867,735 MWh reported by Florida plants in 2025, from 1.0% of the state's 79,936 MW of capacity. Its share of output is 1.9 times its share of capacity. By capacity it is the 28th largest of 331 plants in Florida, the 424th largest of 14,327 in the U.S. and the 235th largest of 1,962 natural gas plants. By 2025 generation it is the 19th largest of 313 generating plants in the state.

Brandy Branch within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)78379,9361.0%
Generation (MWh)4,985,794267,867,7351.9%
Natural gas capacity (MW)78352,8941.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Brandy Branch plant, and when do they retire?

4 operable generators total 783 MW, with an average age of 23 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s4783100%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
001OperatingNatural Gas Fired Combustion Turbine1852001n/a
002OperatingNatural Gas Fired Combined Cycle1852001n/a
003OperatingNatural Gas Fired Combined Cycle1852001n/a
004OperatingNatural Gas Fired Combined Cycle2282005n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Brandy Branch plant?

EIA lists no joint owners for Brandy Branch. Jea operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does JEA charge homes?

JEA, the operator of Brandy Branch, had an average residential price of 13.84¢ per kWh and an average bill of $146 a month in 2025, 9% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
JEA13.84¢$1469% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Brandy Branch plant?

Brandy Branch is in Baldwin, Duval County, Florida, at 30.3206° N, 81.9472° W. It sits in the JEA balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Florida are similar in size?

Florida has 68 operable natural gas plants with 52,894 MW of capacity, and Brandy Branch's 783 MW is 1% of that.

Natural gas plants in Florida around this size
PlantCountyMW2025 MWh
AnclotePasco1,1122,015,598
Oleander Power Project LPBrevard994578,683
Midulla Generating StationHardee8533,537,285
Brandy BranchDuval7834,982,441
Vandolah Power StationHardee728590,728
Intercession CityOsceola709178,748
Cane IslandOsceola7064,017,050

Source: EIA Forms EIA-860 and EIA-923, 2025.