Natural gas power plant, Florida

Intercession City natural gas power plant, Florida

Intercession City is a 1,197 MW power plant, 709 MW of it natural gas, in Osceola County, Florida, operated by Duke Energy Florida, LLC, and it generated 193,919 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 21st percentile of U.S. natural gas plants. By 2025 generation it ranks 2,541st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

1,197 MWNameplate capacity
4%Capacity factor, 2025, natural gas units, 21st percentile, on 525 MW net summer
0.1%Of FL generation, 2025
35 yearsAverage generator age, by MW

How hard does the Intercession City plant run compared with other natural gas plants?

The Intercession City plant's natural gas units had a capacity factor of 4% in 2025 on 525 MW of net summer capacity, the 21st percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 14 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Intercession City4%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its natural gas generators only. Values above 105% are left out of the comparison.

Is the Intercession City plant generating more or less than last year?

Generation at Intercession City fell 43.8% from 2024 to 2025, from 344,920 MWh to 193,919 MWh. Through August 2026 it is running 45.3% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024344,920
2025193,919
2026 through August215,209
2025, same months148,151
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202633,333
July 202641,955
June 202629,213
May 202627,931
April 202630,499
March 202617,358
February 202622,835
January 202612,085
December 20259,492
November 202510,726
October 202512,011
September 202513,539
August 202515,419
July 202543,029
June 202513,744
May 202518,159
April 202519,373
March 202516,497
February 20256,983
January 202514,947
December 202414,814
November 202425,433
October 202437,298
September 202442,807
August 202437,156
July 202440,140
June 202425,511
May 202446,631
April 202429,054
March 202415,377
February 202413,902
January 202416,797

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Intercession City plant?

Intercession City made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 1.5% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 24th largest of 331 plants in Florida, the 224th largest of 14,327 in the U.S. and the 274th largest of 1,962 natural gas plants on its natural gas units alone. By 2025 generation it is the 70th largest of 313 generating plants in the state.

Intercession City within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)1,19779,9361.5%
Generation (MWh)193,919267,867,7350.1%
Natural gas capacity (MW)70952,8941.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Intercession City plant, and when do they retire?

14 operable generators total 1,197 MW, with an average age of 35 years weighted by capacity at the end of 2025. 170 MW, 14% of operable capacity, has a planned retirement, the first in 2034.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1970s634028%2034
1990s556347%none reported
2000s329525%none reported
Capacity retiring by year
YearUnitsMW retiringShare of plant
2034317014%
Every generator, 14 in all
UnitStatusTechnologyMWIn servicePlanned retirement
P1OperatingPetroleum Liquids571974n/a
P2OperatingPetroleum Liquids571974n/a
P3OperatingPetroleum Liquids571974n/a
P4OperatingPetroleum Liquids5719742034
P5OperatingPetroleum Liquids5719742034
P6OperatingPetroleum Liquids5719742034
P7OperatingNatural Gas Fired Combustion Turbine1041993n/a
P8OperatingNatural Gas Fired Combustion Turbine1041993n/a
P9OperatingNatural Gas Fired Combustion Turbine1041993n/a
P10OperatingNatural Gas Fired Combustion Turbine1041993n/a
P11OperatingPetroleum Liquids1491997n/a
P12OperatingNatural Gas Fired Combustion Turbine982000n/a
P13OperatingNatural Gas Fired Combustion Turbine982000n/a
P14OperatingNatural Gas Fired Combustion Turbine982000n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Intercession City plant?

2 owners report shares in Intercession City; Duke Energy Florida, LLC holds the largest named share, 8.3% or about 99 MW. Duke Energy Florida, LLC operates the plant. The listed shares add up to 12.4% of capacity; generators without joint owners are not on this list.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
Duke Energy Florida, LLC8.3%9916,037
Georgia Power Co4.1%498,009

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

What does Duke Energy Florida, LLC charge homes?

Duke Energy Florida, LLC, the operator of Intercession City, had an average residential price of 18.36¢ per kWh and an average bill of $185 a month in 2025, 21% above the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Duke Energy Florida, LLC18.36¢$18521% higher
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

What fuels does the Intercession City plant use?

Intercession City has capacity on 2 fuels: 59% natural gas and 41% petroleum. In 2025, natural gas made 92% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Natural gas70959.2%178,748
Petroleum48940.8%15,171

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Intercession City plant?

Intercession City is in Intercession City, Osceola County, Florida, at 28.2628° N, 81.5486° W. It sits in the Progress Energy Florida balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Florida are similar in size?

Florida has 68 operable natural gas plants with 52,894 MW of capacity, and Intercession City's 709 MW is 1% of that.

Natural gas plants in Florida around this size
PlantCountyMW2025 MWh
Midulla Generating StationHardee8533,537,285
Brandy BranchDuval7834,982,441
Vandolah Power StationHardee728590,728
Intercession CityOsceola709178,748
Cane IslandOsceola7064,017,050
Curtis H Stanton Energy CenterOrange6883,477,956
Arvah B HopkinsLeon6731,642,172

Source: EIA Forms EIA-860 and EIA-923, 2025.