Skip to main content
RateWatt

Natural gas power plant, Connecticut

Bridgeport Station, Connecticut

Bridgeport Station is a 576 MW natural gas power plant in Fairfield County, Connecticut, operated by Generation Bridge II Connecticut, LLC, and it generated 3,373,089 MWh in 2025 (Forms EIA-860 and EIA-923). That is 7.7% of the generation reported in Connecticut, and its capacity factor sits at the 90th percentile of U.S. natural gas plants. By 2025 generation it ranks 351st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

576 MWNameplate capacity
76%Capacity factor, 2025, 90th percentile, on 496 MW net summer
7.7%Of CT generation, 2025
6 yearsAverage generator age, by MW

How hard does Bridgeport Station run compared with other natural gas plants?

Bridgeport Station had a capacity factor of 76% in 2025 on 496 MW of net summer capacity, the 90th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 279 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Bridgeport Station76%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Bridgeport Station generating more or less than last year?

Generation at Bridgeport Station fell 3.2% from 2024 to 2025, from 3,484,999 MWh to 3,373,089 MWh. Through August 2026 it is running 6.3% behind the same months of 2025.

Net generation by period
PeriodMWh
20243,484,999
20253,373,089
2026 through August2,206,330
2025, same months2,355,140
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026326,590
July 2026315,579
June 2026306,670
May 2026319,116
April 202651,939
March 2026311,767
February 2026270,505
January 2026304,164
December 2025324,408
November 2025282,732
October 2025144,313
September 2025266,496
August 2025317,038
July 2025328,062
June 2025307,867
May 2025312,845
April 2025221,403
March 2025277,842
February 2025279,439
January 2025310,644
December 2024340,962
November 2024332,510
October 2024236,215
September 2024330,844
August 2024340,542
July 2024343,799
June 2024313,481
May 2024321,573
April 202470,500
March 2024323,879
February 2024259,921
January 2024270,773

Source: EIA Form EIA-923, through August 2026.

How much of Connecticut's electricity comes from Bridgeport Station?

Bridgeport Station made 7.7% of the 43,744,586 MWh reported by Connecticut plants in 2025, from 5.2% of the state's 10,990 MW of capacity. Its share of output is 1.5 times its share of capacity. By capacity it is the 8th largest of 182 plants in Connecticut, the 643rd largest of 14,327 in the U.S. and the 397th largest of 1,962 natural gas plants. By 2025 generation it is the 4th largest of 168 generating plants in the state.

Bridgeport Station within Connecticut, 2025
MeasureThis plantConnecticutShare
Capacity (MW)57610,9905.2%
Generation (MWh)3,373,08943,744,5867.7%
Natural gas capacity (MW)5764,95711.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Bridgeport Station, and when do they retire?

2 operable generators total 576 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 3 have already retired, totalling 582 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s2576100%none reported
Every generator, 5 in all
UnitStatusTechnologyMWIn servicePlanned retirement
501OperatingNatural Gas Fired Combined Cycle3762019n/a
502OperatingNatural Gas Fired Combined Cycle2012019n/a
2RetiredPetroleum Liquids16319612014
4RetiredPetroleum Liquids1919672021
3RetiredConventional Steam Coal40019682021

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Bridgeport Station?

EIA lists no joint owners for Bridgeport Station. Generation Bridge II Connecticut, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is Bridgeport Station?

Bridgeport Station is in Bridgeport, Fairfield County, Connecticut, at 41.1706° N, 73.1844° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Connecticut are similar in size?

Connecticut has 47 operable natural gas plants with 4,957 MW of capacity, and Bridgeport Station's 576 MW is 12% of that.

Natural gas plants in Connecticut around this size
PlantCountyMW2025 MWh
Lake Road Generating PlantWindham8405,814,808
Kleen Energy SystemsMiddlesex6933,194,098
Milford Power ProjectNew Haven5783,368,307
Bridgeport StationFairfield5763,322,871
Bridgeport Energy ProjectFairfield5202,397,502
Wallingford EnergyNew Haven350106,980

Source: EIA Forms EIA-860 and EIA-923, 2025.