Natural gas power plant, Connecticut
Kleen Energy Systems natural gas power plant, Connecticut
Kleen Energy Systems is a 693 MW natural gas power plant in Middlesex County, Connecticut, operated by Kleen Energy Systems, LLC, and it generated 3,216,190 MWh in 2025 (Forms EIA-860 and EIA-923). That is 7.4% of the generation reported in Connecticut, and its capacity factor sits at the 77th percentile of U.S. natural gas plants. By 2025 generation it ranks 368th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Kleen Energy Systems plant run compared with other natural gas plants?
The Kleen Energy Systems plant had a capacity factor of 59% in 2025 on 622 MW of net summer capacity, the 77th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 214 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Kleen Energy Systems | 59% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Kleen Energy Systems plant generating more or less than last year?
Generation at Kleen Energy Systems rose 10.4% from 2024 to 2025, from 2,912,514 MWh to 3,216,190 MWh. Through August 2026 it is running 35.1% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 2,912,514 |
| 2025 | 3,216,190 |
| 2026 through August | 2,607,968 |
| 2025, same months | 1,930,099 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 419,985 |
| July 2026 | 422,525 |
| June 2026 | 386,011 |
| May 2026 | 383,603 |
| April 2026 | 184,525 |
| March 2026 | 322,831 |
| February 2026 | 272,828 |
| January 2026 | 215,660 |
| December 2025 | 273,477 |
| November 2025 | 355,351 |
| October 2025 | 264,280 |
| September 2025 | 392,983 |
| August 2025 | 399,122 |
| July 2025 | 379,886 |
| June 2025 | 267,852 |
| May 2025 | 254,323 |
| April 2025 | 263,935 |
| March 2025 | 127,378 |
| February 2025 | 127,967 |
| January 2025 | 109,636 |
| December 2024 | 127,864 |
| November 2024 | 285,892 |
| October 2024 | 404,721 |
| September 2024 | 387,657 |
| August 2024 | 411,962 |
| July 2024 | 420,641 |
| June 2024 | 321,538 |
| May 2024 | 280,410 |
| April 2024 | 5,466 |
| March 2024 | 97,241 |
| February 2024 | 53,993 |
| January 2024 | 115,129 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Kleen Energy Systems plant, and when do they retire?
3 operable generators total 693 MW, with an average age of 14 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 3 | 693 | 100% | none reported |
Every generator, 3 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| ST | Operating | Natural Gas Fired Combined Cycle | 295 | 2011 | n/a |
| U1 | Operating | Natural Gas Fired Combined Cycle | 199 | 2011 | n/a |
| U2 | Operating | Natural Gas Fired Combined Cycle | 199 | 2011 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Kleen Energy Systems plant?
EIA lists no joint owners for Kleen Energy Systems. Kleen Energy Systems, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Kleen Energy Systems plant?
Kleen Energy Systems is in Middletown, Middlesex County, Connecticut, at 41.5532° N, 72.5969° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Connecticut are similar in size?
Connecticut has 47 operable natural gas plants with 4,957 MW of capacity, and Kleen Energy Systems' 693 MW is 14% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| CPV Towantic Energy Center | New Haven | 842 | 4,811,257 |
| Lake Road Generating Plant | Windham | 840 | 5,814,808 |
| Kleen Energy Systems | Middlesex | 693 | 3,194,098 |
| Milford Power Project | New Haven | 578 | 3,368,307 |
| Bridgeport Station | Fairfield | 576 | 3,322,871 |
| Bridgeport Energy Project | Fairfield | 520 | 2,397,502 |
Source: EIA Forms EIA-860 and EIA-923, 2025.