Wind power plant, Illinois

Bright Stalk Wind Farm I power plant, Illinois

Bright Stalk Wind Farm I is a 205 MW wind power plant in McLean County, Illinois, operated by Lexington Chenoa Wind Farm LLC, and it generated 726,185 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Illinois, and its capacity factor sits at the 74th percentile of U.S. wind plants. By 2025 generation it ranks 958th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

205 MWNameplate capacity
40%Capacity factor, 2025, 74th percentile, on 205 MW net summer
0.4%Of IL generation, 2025
6 yearsAverage generator age, by MW

How hard does the Bright Stalk Wind Farm I plant run compared with other wind plants?

The Bright Stalk Wind Farm I plant had a capacity factor of 40% in 2025 on 205 MW of net summer capacity, the 74th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 147 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Bright Stalk Wind Farm I40%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Bright Stalk Wind Farm I plant generating more or less than last year?

Bright Stalk Wind Farm I generated 726,185 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 7.7% ahead of the same months of 2025. 2024 has output for only 11 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024705,318
2025726,185
2026 through August512,875
2025, same months476,424
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202629,687
July 202626,797
June 202650,360
May 202662,297
April 202693,795
March 202696,195
February 202668,582
January 202685,162
December 202582,973
November 202572,049
October 202568,447
September 202526,292
August 202528,483
July 202525,164
June 202542,996
May 202562,575
April 202564,993
March 202591,793
February 202573,545
January 202586,875
December 202480,632
November 202477,619
October 202468,785
September 202432,897
August 202433,015
July 202428,196
June 202463,208
April 202488,305
March 202492,286
February 202469,544
January 202470,831

Source: EIA Form EIA-923, through August 2026.

How much of Illinois' electricity comes from the Bright Stalk Wind Farm I plant?

Bright Stalk Wind Farm I made 0.4% of the 191,710,915 MWh reported by Illinois plants in 2025, from 0.4% of the state's 52,515 MW of capacity. By capacity it is the 60th largest of 602 plants in Illinois, the 1,461st largest of 14,327 in the U.S. and the 226th largest of 1,358 wind plants. By 2025 generation it is the 29th largest of 531 generating plants in the state.

Bright Stalk Wind Farm I within Illinois, 2025
MeasureThis plantIllinoisShare
Capacity (MW)20552,5150.4%
Generation (MWh)726,185191,710,9150.4%
Wind capacity (MW)2058,4582.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Bright Stalk Wind Farm I plant, and when do they retire?

1 operable generator totals 205 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1205100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingOnshore Wind Turbine2052019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Bright Stalk Wind Farm I plant?

EIA lists no joint owners for Bright Stalk Wind Farm I. Lexington Chenoa Wind Farm LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Bright Stalk Wind Farm I plant?

Bright Stalk Wind Farm I is in Chenoa, McLean County, Illinois, at 40.7012° N, 88.7011° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Illinois are similar in size?

Illinois has 55 operable wind plants with 8,458 MW of capacity, and Bright Stalk Wind Farm I's 205 MW is 2% of that.

Wind plants in Illinois around this size
PlantCountyMW2025 MWh
Walnut Ridge Wind FarmBureau212754,700
High Trail Wind Farm LLCMcLean211508,689
Grand Ridge Wind Energy CenterLaSalle210447,231
Bright Stalk Wind Farm IMcLean205726,185
Top Hat WindLogan20473,628
Sugar Creek Wind One LLCLogan202581,921
Harvest Ridge Wind FarmDouglas202667,048

Source: EIA Forms EIA-860 and EIA-923, 2025.