Brownsville Peaking Power is a 460 MW natural gas power plant in Haywood County, Tennessee, operated by Tennessee Valley Authority, and it generated 119,443 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Tennessee, and its capacity factor sits at the 18th percentile of U.S. natural gas plants. By 2025 generation it ranks 3,205th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

460 MWNameplate capacity
3%Capacity factor, 2025, 18th percentile, on 456 MW net summer
0.2%Of TN generation, 2025
26 yearsAverage generator age, by MW

How hard does the Brownsville Peaking Power plant run compared with other natural gas plants?

The Brownsville Peaking Power plant had a capacity factor of 3% in 2025 on 456 MW of net summer capacity, the 18th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 11 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Brownsville Peaking Power3%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Brownsville Peaking Power plant generating more or less than last year?

Generation at Brownsville Peaking Power rose 77.1% from 2024 to 2025, from 67,455 MWh to 119,443 MWh.

Net generation by period
PeriodMWh
202467,455
2025119,443
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20256,206
November 20253,970
October 20251,161
September 20251,406
August 20257,654
July 20255,977
June 20254,796
May 20250
April 20258,484
March 20252,876
February 202521,871
January 202555,041
December 20243,552
November 20242,466
October 20249,093
September 20247,055
August 202417,567
July 20248,162
June 2024969
May 20242,994
April 20243,407
March 2024213
February 2024188
January 202411,790

Source: EIA Form EIA-923, through August 2026.

How much of Tennessee's electricity comes from the Brownsville Peaking Power plant?

Brownsville Peaking Power made 0.2% of the 74,359,316 MWh reported by Tennessee plants in 2025, from 2.0% of the state's 23,342 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 12th largest of 99 plants in Tennessee, the 784th largest of 14,327 in the U.S. and the 484th largest of 1,962 natural gas plants. By 2025 generation it is the 40th largest of 95 generating plants in the state.

Brownsville Peaking Power within Tennessee, 2025
MeasureThis plantTennesseeShare
Capacity (MW)46023,3422.0%
Generation (MWh)119,44374,359,3160.2%
Natural gas capacity (MW)4606,6416.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Brownsville Peaking Power plant, and when do they retire?

4 operable generators total 460 MW, with an average age of 26 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1990s4460100%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingNatural Gas Fired Combustion Turbine1121999n/a
2OperatingNatural Gas Fired Combustion Turbine1121999n/a
3OperatingNatural Gas Fired Combustion Turbine1181999n/a
4OperatingNatural Gas Fired Combustion Turbine1181999n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Brownsville Peaking Power plant?

EIA lists no joint owners for Brownsville Peaking Power. Tennessee Valley Authority operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Brownsville Peaking Power plant?

Brownsville Peaking Power is in Brownsville, Haywood County, Tennessee, at 35.5438° N, 89.1980° W. It sits in the Tennessee Valley Authority balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Tennessee are similar in size?

Tennessee has 12 operable natural gas plants with 6,641 MW of capacity, and Brownsville Peaking Power's 460 MW is 7% of that.

Natural gas plants in Tennessee around this size
PlantCountyMW2025 MWh
Gleason Generating FacilityWeakley568719,948
Brownsville Peaking PowerHaywood460119,443