TN power plants
Power plants in Tennessee
Tennessee has 99 operable power plants with 23.3 GW of nameplate capacity (Form EIA-860, 2025). The largest is Cumberland (TN), at 2,600 MW, and natural gas has the most capacity, 29% of the state total.
What fuels do Tennessee's power plants use?
Natural gas makes up 29% of Tennessee's capacity, and coal 27%. The largest share of 2025 generation came from nuclear, at 39.4%.
| Fuel | Plants | Capacity | Share | 2025 MWh | Share |
|---|---|---|---|---|---|
| Natural gas | 12 | 6,761 MW | 29.0% | 17,067,977 | 23.0% |
| Coal | 4 | 6,413 MW | 27.5% | 17,874,051 | 24.0% |
| Nuclear | 2 | 4,981 MW | 21.3% | 29,333,225 | 39.4% |
| Hydro | 28 | 2,520 MW | 10.8% | 8,839,988 | 11.9% |
| Battery and pumped storage | 1 | 1,714 MW | 7.3% | -537,505 | -0.7% |
| Solar | 45 | 819 MW | 3.5% | 1,274,854 | 1.7% |
| Biomass | 4 | 85.1 MW | 0.4% | 504,928 | 0.7% |
| Petroleum | 3 | 49.6 MW | 0.2% | 1,799 | 0.0% |
Source: EIA Forms EIA-860 and EIA-923, 2025.
What power plants are in Tennessee?
The 10 largest of Tennessee's 99 plants hold 79% of its capacity, and half of the plants are 22 MW or smaller.
| Plant | Fuel | County | MW | 2025 MWh |
|---|---|---|---|---|
| Cumberland (TN) | Coal | Stewart | 2,600 | 9,096,100 |
| Watts Bar Nuclear Plant | Nuclear | Rhea | 2,540 | 16,273,295 |
| Sequoyah | Nuclear | Hamilton | 2,441 | 13,059,930 |
| Gallatin (TN) | Coal | Sumner | 1,918 | 4,324,100 |
| Raccoon Mountain | Battery and pumped storage | Hamilton | 1,714 | -537,505 |
| Kingston | Coal | Roane | 1,700 | 3,382,008 |
| Johnsonville | Natural gas | Humphreys | 1,676 | 1,433,228 |
| Lagoon Creek | Natural gas | Haywood | 1,625 | 3,449,345 |
| Allen | Natural gas | Shelby | 1,290 | 5,845,135 |
| John Sevier | Natural gas | Hawkins | 997 | 4,749,871 |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity is nameplate of operable generators. Ranks 1 to 10 run from 2,600 MW at Cumberland (TN) to 997 MW at John Sevier.
| Plant | Fuel | County | MW | 2025 MWh |
|---|---|---|---|---|
| Gleason Generating Facility | Natural gas | Weakley | 568 | 719,948 |
| Brownsville Peaking Power | Natural gas | Haywood | 460 | 119,443 |
| Pickwick Landing Dam | Hydro | Hardin | 240 | 1,294,568 |
| Tennessee Eastman Operations | Coal | Sullivan | 194 | 1,071,843 |
| Ridgely Energy Farm | Solar | Lake | 177 | 152,381 |
| Watts Bar Hydro | Hydro | Rhea | 175 | 865,430 |
| Chickamauga | Hydro | Hamilton | 160 | 693,812 |
| Calderwood | Hydro | Blount | 157 | 568,694 |
| Center Hill | Hydro | DeKalb | 156 | 355,792 |
| Fort Loudoun | Hydro | Loudon | 153 | 633,112 |
| Douglas Dam | Hydro | Sevier | 151 | 341,251 |
| Elora Solar | Solar | Lincoln | 150 | 316,033 |
| Cherokee Dam | Hydro | Jefferson | 135 | 315,280 |
| Norris Dam | Hydro | Anderson | 131 | 416,334 |
| Boone Dam | Hydro | Sullivan | 106 | 145,459 |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity is nameplate of operable generators. Ranks 11 to 25 run from 568 MW at Gleason Generating Facility to 106 MW at Boone Dam.
| Plant | Fuel | County | MW | 2025 MWh |
|---|---|---|---|---|
| Nickajack | Hydro | Marion | 104 | 577,626 |
| Old Hickory | Hydro | Sumner | 104 | 324,741 |
| OETN1 | Solar | Obion | 100 | 160,351 |
| Cordell Hull | Hydro | Smith | 99.9 | 441,299 |
| Apalachia | Hydro | Polk | 93.6 | 389,144 |
| Packaging Corp of America | Biomass | Hardin | 72.5 | 430,065 |
| Melton Hill | Hydro | Loudon | 72 | 145,131 |
| SR McKellar | Solar | Madison | 70 | 139,019 |
| Primient Loudon Plant | Natural gas | Loudon | 61.4 | 366,385 |
| Fort Patrick Henry | Hydro | Sullivan | 59.4 | 94,765 |
| Watauga | Hydro | Carter | 57.6 | 94,002 |
| Dale Hollow | Hydro | Clay | 54 | 120,945 |
| Millington Solar Farm | Solar | Shelby | 53 | 93,143 |
| Domtar Kingsport Mill | Natural gas | Sullivan | 50 | 182,926 |
| Chilhowee | Hydro | Blount | 49.8 | 157,680 |
| Tims Ford | Hydro | Franklin | 45.7 | 41,215 |
| South Holston | Hydro | Sullivan | 38.5 | 121,520 |
| Cheatham | Hydro | Dickson | 36 | 191,448 |
| SR Bell Buckle | Solar | Bedford | 35 | 68,997 |
| Great Falls (TN) | Hydro | Warren | 33.7 | 131,052 |
| Ocoee 3 | Hydro | Polk | 28.8 | 141,310 |
| J P Priest | Hydro | Davidson | 28 | 60,375 |
| McMinnville | Petroleum | Warren | 24 | 865 |
| Ocoee 2 | Hydro | Polk | 23 | 98,148 |
| Powell Valley | Petroleum | Hancock | 22 | 934 |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity is nameplate of operable generators. Ranks 26 to 50 run from 104 MW at Nickajack to 22 MW at Powell Valley.
| Plant | Fuel | County | MW | 2025 MWh |
|---|---|---|---|---|
| Ocoee 1 | Hydro | Polk | 19 | 65,629 |
| Vanderbilt University Power Plant | Natural gas | Davidson | 18.7 | 105,673 |
| Providence Solar | Solar | Madison | 16 | 30,545 |
| Selmer I | Solar | McNairy | 16 | 27,758 |
| SR Canadaville, LLC | Solar | Fayette | 16 | 35,316 |
| Mulberry Farm LLC | Solar | McNairy | 15.8 | 24,993 |
| Selmer Farm LLC | Solar | McNairy | 15.8 | 25,602 |
| Latitude Solar Center | Solar | Hardeman | 15 | 25,724 |
| Wildberry | Solar | Fayette | 15 | 24,562 |
| Wilbur | Hydro | Carter | 10.6 | 14,226 |
| SR Washington I, LLC | Solar | Washington | 9 | 19,914 |
| Selmer II | Solar | McNairy | 8 | 15,049 |
| Volkswagen Solar System | Solar | Hamilton | 7.6 | 12,406 |
| SR Maryville East | Solar | Blount | 7.5 | 0 |
| SR Paris | Solar | Henry | 6.8 | 13,892 |
| SR Lexington | Solar | Henderson | 6.5 | 38 |
| SR Trezevant | Solar | Carroll | 6.5 | 3,938 |
| DMAT Denso - SEAT Solar Holdings, LLC | Solar | McMinn | 5.3 | 6 |
| University of Tennessee Steam Plant | Natural gas | Knox | 5 | 33,385 |
| MTSU Power Co-Gen Plant | Natural gas | Rutherford | 5 | 37,478 |
| Chestnut Ridge Gas Recovery | Biomass | Anderson | 4.8 | 33,962 |
| West Camden | Biomass | Benton | 4.8 | 33,626 |
| SR Greenville I | Solar | Greene | 4.8 | 10,120 |
| SR Greenville II | Solar | Greene | 4.8 | 9,657 |
| SR Clarksville II, LLC | Solar | Montgomery | 4.8 | 10,013 |
| SR Monroe, LLC | Solar | Overton | 4.8 | 1,858 |
| Opryland USA | Natural gas | Davidson | 4.5 | 25,160 |
| SR Jonesborough | Solar | Washington | 4.4 | 7,242 |
| SR Albany, LLC | Solar | Greene | 4.3 | 41 |
| West Tennessee Solar Farm | Solar | Haywood | 4.2 | 3,150 |
| Mountain Home Energy Center | Petroleum | Washington | 3.6 | n/a |
| SR Bolivar | Solar | Hardeman | 3.3 | 6,708 |
| SR Christiana, LLC | Solar | Rutherford | 3.3 | 2,673 |
| Bi-County Gas Producers | Biomass | Montgomery | 3 | 7,275 |
| Haywood Solar | Solar | Haywood | 3 | 5,498 |
| SR Brownsville | Solar | Haywood | 3 | 1,922 |
| Chattanooga Metropolitan Airport Solar | Solar | Hamilton | 2.5 | 2,585 |
| SR Forked Deer | Solar | Lauderdale | 2.5 | 283 |
| Somerville Solar | Solar | Fayette | 2.3 | 1,851 |
| SR Trenton | Solar | Gibson | 2.3 | 455 |
| SR Clarksville, LLC | Solar | Montgomery | 2 | 4,196 |
| SR White Pine, LLC | Solar | Jefferson | 2 | 4,392 |
| Music City Community Solar | Solar | Davidson | 1.6 | 2,425 |
| SR Innovation - NIKE PV | Solar | Shelby | 1.5 | 3,542 |
| SR Blount, LLC | Solar | Blount | 1.5 | 707 |
| SR Marion, LLC | Solar | Sequatchie | 1.3 | 2,543 |
| SR Maryville | Solar | Blount | 1.3 | 0 |
| IKEA Memphis 508 | Solar | Shelby | 1.1 | 1,132 |
| SR Jackson II | Solar | Madison | 1 | 2,194 |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity is nameplate of operable generators. Ranks 51 to 99 run from 19 MW at Ocoee 1 to 1 MW at SR Jackson II.
Which Tennessee plants are not running?
25 more sites in Tennessee have no operable generators in 2025: proposed projects, retired plants and sites still on file.
Show 25 sites without operable generators
| Site | County | Proposed | Retired |
|---|---|---|---|
| SR Tullahoma | Moore | 200 MW | n/a |
| Graceland Solar, LLC | Shelby | 150 MW | n/a |
| Yum Yum Solar LLC | Fayette | 147 MW | n/a |
| SR Copeland | Cumberland | 110 MW | n/a |
| SR Millington II | Shelby | 74.9 MW | n/a |
| SR Durhamville | Haywood | 66 MW | n/a |
| SR Middleton | Hardeman | 55 MW | n/a |
| SR Puryear | Henry | 50 MW | n/a |
| SR Denmark | Madison | 42 MW | n/a |
| SR Adamsville | McNairy | 25 MW | n/a |
| Vonore Battery Energy Storage System | Monroe | 20 MW | n/a |
| SR Shelby | Shelby | 9.8 MW | n/a |
| SR Sequatchie | Sequatchie | 8 MW | n/a |
| SR Gray | Washington | 6 MW | n/a |
| SR Shelby II, LLC | Shelby | 6 MW | n/a |
| SR Hickman | Hickman | 5.5 MW | n/a |
| SR South Gibson | Gibson | 4.8 MW | n/a |
| SR Benton | Benton | 3 MW | n/a |
| SR Milan | Gibson | 2.8 MW | n/a |
| Bull Run | Anderson | n/a | 950 MW |
| Watts Bar Fossil | Rhea | n/a | 240 MW |
| Buffalo Mountain Energy Center | Anderson | n/a | 27 MW |
| Middle Point Landfill Gas Recovery | Rutherford | n/a | 2.8 MW |
| Buffalo Mountain | Anderson | n/a | 1.8 MW |
| Franklin (TN) | Franklin | n/a | n/a |
Source: EIA Form EIA-860, 2025 final.