Primient Loudon Plant, Tennessee

Primient Loudon Plant is a 61.4 MW natural gas power plant in Loudon County, Tennessee, operated by Primient, LLC, and it generated 366,385 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Tennessee, and its capacity factor sits at the 93rd percentile of U.S. natural gas plants. By 2025 generation it ranks 1,703rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

61.4 MWNameplate capacity
80%Capacity factor, 2025, 93rd percentile, on 52 MW net summer
0.5%Of TN generation, 2025
9 yearsAverage generator age, by MW

How hard does Primient Loudon Plant run compared with other natural gas plants?

Primient Loudon Plant had a capacity factor of 80% in 2025 on 52 MW of net summer capacity, the 93rd percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 294 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Primient Loudon Plant80%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Primient Loudon Plant generating more or less than last year?

Generation at Primient Loudon Plant fell 6.9% from 2024 to 2025, from 393,562 MWh to 366,385 MWh.

Net generation by period
PeriodMWh
2024393,562
2025366,385
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202536,688
November 202520,966
October 202516,138
September 202529,667
August 202534,616
July 202535,223
June 202531,559
May 202529,740
April 202527,194
March 202528,268
February 202535,249
January 202541,077
December 202437,315
November 202432,361
October 202423,904
September 202440,155
August 202443,333
July 202441,882
June 202433,806
May 202419,740
April 202420,725
March 202431,376
February 202430,952
January 202438,014

Source: EIA Form EIA-923, through August 2026.

How much of Tennessee's electricity comes from Primient Loudon Plant?

Primient Loudon Plant made 0.5% of the 74,359,316 MWh reported by Tennessee plants in 2025, from 0.3% of the state's 23,342 MW of capacity. Its share of output is 1.9 times its share of capacity. By capacity it is the 34th largest of 99 plants in Tennessee, the 3,490th largest of 14,327 in the U.S. and the 1,016th largest of 1,962 natural gas plants. By 2025 generation it is the 22nd largest of 95 generating plants in the state.

Primient Loudon Plant within Tennessee, 2025
MeasureThis plantTennesseeShare
Capacity (MW)6123,3420.3%
Generation (MWh)366,38574,359,3160.5%
Natural gas capacity (MW)616,6410.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Primient Loudon Plant, and when do they retire?

2 operable generators total 61.4 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s261100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
Y9111OperatingNatural Gas Fired Combustion Turbine312016n/a
Y9121OperatingNatural Gas Fired Combustion Turbine312016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Primient Loudon Plant?

EIA lists no joint owners for Primient Loudon Plant. Primient, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is Primient Loudon Plant?

Primient Loudon Plant is in Loudon, Loudon County, Tennessee, at 35.7351° N, 84.3193° W. It sits in the Tennessee Valley Authority balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Tennessee are similar in size?

Tennessee has 12 operable natural gas plants with 6,641 MW of capacity, and Primient Loudon Plant's 61.4 MW is 1% of that.

Natural gas plants in Tennessee around this size
PlantCountyMW2025 MWh
Primient Loudon PlantLoudon61366,385
Domtar Kingsport MillSullivan50138,388

Source: EIA Forms EIA-860 and EIA-923, 2025.