Millington Solar Farm, Tennessee

Millington Solar Farm is a 53 MW solar power plant in Shelby County, Tennessee, operated by SR Millington, LLC, and it generated 93,143 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Tennessee, and its capacity factor sits at the 26th percentile of U.S. solar plants. By 2025 generation it ranks 3,474th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

53 MWNameplate capacity
20%Capacity factor, 2025, 26th percentile, on 53 MW net summer
0.1%Of TN generation, 2025
7 yearsAverage generator age, by MW

How hard does the Millington Solar Farm plant run compared with other solar plants?

The Millington Solar Farm plant had a capacity factor of 20% in 2025 on 53 MW of net summer capacity, the 26th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 73 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Millington Solar Farm20%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Millington Solar Farm plant generating more or less than last year?

Generation at Millington Solar Farm fell 3.7% from 2024 to 2025, from 96,762 MWh to 93,143 MWh. Through August 2026 it is running 13.4% ahead of the same months of 2025.

Net generation by period
PeriodMWh
202496,762
202593,143
2026 through August76,793
2025, same months67,719
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202612,524
July 202611,926
June 202611,408
May 202610,035
April 20269,882
March 20268,771
February 20266,398
January 20265,849
December 20254,062
November 20255,218
October 20257,288
September 20258,856
August 202510,580
July 202511,184
June 20258,070
May 20258,285
April 20259,478
March 20259,074
February 20255,395
January 20255,653
December 20244,005
November 20245,075
October 20248,810
September 20246,383
August 202410,690
July 202410,518
June 202411,668
May 202410,525
April 20249,958
March 20248,808
February 20246,464
January 20243,858

Source: EIA Form EIA-923, through August 2026.

How much of Tennessee's electricity comes from the Millington Solar Farm plant?

Millington Solar Farm made 0.1% of the 74,359,316 MWh reported by Tennessee plants in 2025, from 0.2% of the state's 23,342 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 38th largest of 99 plants in Tennessee, the 3,679th largest of 14,327 in the U.S. and the 844th largest of 7,223 solar plants. By 2025 generation it is the 45th largest of 95 generating plants in the state.

Millington Solar Farm within Tennessee, 2025
MeasureThis plantTennesseeShare
Capacity (MW)5323,3420.2%
Generation (MWh)93,14374,359,3160.1%
Solar capacity (MW)538196.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Millington Solar Farm plant, and when do they retire?

1 operable generator totals 53 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s153100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
MILLOperatingSolar Photovoltaic532018n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Millington Solar Farm plant?

EIA lists no joint owners for Millington Solar Farm. SR Millington, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Millington Solar Farm plant?

Millington Solar Farm is in Millington, Shelby County, Tennessee, at 35.3515° N, 89.8547° W. It sits in the Tennessee Valley Authority balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Tennessee are similar in size?

Tennessee has 45 operable solar plants with 819 MW of capacity, and Millington Solar Farm's 53 MW is 6% of that.

Solar plants in Tennessee around this size
PlantCountyMW2025 MWh
OETN1Obion100160,351
SR McKellarMadison70139,019
Millington Solar FarmShelby5393,143
SR Bell BuckleBedford3568,997

Source: EIA Forms EIA-860 and EIA-923, 2025.