Hydro power plant, Tennessee
Watts Bar Hydro hydroelectric power plant, Tennessee
Watts Bar Hydro is a 175 MW hydro power plant in Rhea County, Tennessee, operated by Tennessee Valley Authority, and it generated 865,430 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.2% of the generation reported in Tennessee, and its capacity factor sits at the 87th percentile of U.S. hydro plants. By 2025 generation it ranks 820th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Watts Bar Hydro plant run compared with other hydro plants?
The Watts Bar Hydro plant had a capacity factor of 50% in 2025 on 196 MW of net summer capacity, the 87th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 184 days at full output out of 365.
0%Shaded: the middle half of hydro plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Watts Bar Hydro | 50% |
| Hydro plants, 75th percentile | 44% |
| Hydro plants, median | 33% |
| Hydro plants, 25th percentile | 22% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Watts Bar Hydro plant generating more or less than last year?
Generation at Watts Bar Hydro fell 3.4% from 2024 to 2025, from 895,606 MWh to 865,430 MWh.
| Period | MWh |
|---|---|
| 2024 | 895,606 |
| 2025 | 865,430 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 56,355 |
| November 2025 | 72,321 |
| October 2025 | 66,176 |
| September 2025 | 58,902 |
| August 2025 | 79,712 |
| July 2025 | 61,633 |
| June 2025 | 71,062 |
| May 2025 | 77,325 |
| April 2025 | 44,818 |
| March 2025 | 79,426 |
| February 2025 | 116,005 |
| January 2025 | 81,695 |
| December 2024 | 79,388 |
| November 2024 | 69,683 |
| October 2024 | 94,930 |
| September 2024 | 54,294 |
| August 2024 | 73,861 |
| July 2024 | 45,802 |
| June 2024 | 52,390 |
| May 2024 | 78,287 |
| April 2024 | 23,025 |
| March 2024 | 88,688 |
| February 2024 | 125,731 |
| January 2024 | 109,527 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Watts Bar Hydro plant, and when do they retire?
5 operable generators total 175 MW, with an average age of 82 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1940s | 5 | 175 | 100% | none reported |
Every generator, 5 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| HY1 | Operating | Conventional Hydroelectric | 41 | 1942 | n/a |
| HY2 | Operating | Conventional Hydroelectric | 33 | 1942 | n/a |
| HY3 | Operating | Conventional Hydroelectric | 33 | 1942 | n/a |
| HY4 | Operating | Conventional Hydroelectric | 33 | 1944 | n/a |
| HY5 | Operating | Conventional Hydroelectric | 33 | 1944 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Watts Bar Hydro plant?
EIA lists no joint owners for Watts Bar Hydro. Tennessee Valley Authority operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Watts Bar Hydro plant?
Watts Bar Hydro is in Spring City, Rhea County, Tennessee, at 35.6197° N, 84.7855° W. It sits in the Tennessee Valley Authority balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which hydro plants in Tennessee are similar in size?
Tennessee has 28 operable hydro plants with 2,520 MW of capacity, and Watts Bar Hydro's 175 MW is 7% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Pickwick Landing Dam | Hardin | 240 | 1,294,568 |
| Watts Bar Hydro | Rhea | 175 | 865,430 |
| Chickamauga | Hamilton | 160 | 693,812 |
| Calderwood | Blount | 157 | 568,694 |
| Center Hill | DeKalb | 156 | 355,792 |
Source: EIA Forms EIA-860 and EIA-923, 2025.