Wind power plant, Texas
Buffalo Gap 2 Wind Farm, Texas
Buffalo Gap 2 Wind Farm is a 233 MW wind power plant in Nolan County, Texas, operated by AES Distributed Energy, and it generated 350,443 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 7th percentile of U.S. wind plants. By 2025 generation it ranks 1,771st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Buffalo Gap 2 Wind Farm plant run compared with other wind plants?
The Buffalo Gap 2 Wind Farm plant had a capacity factor of 17% in 2025 on 233 MW of net summer capacity, the 7th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 63 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Buffalo Gap 2 Wind Farm | 17% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Buffalo Gap 2 Wind Farm plant generating more or less than last year?
Generation at Buffalo Gap 2 Wind Farm fell 10.9% from 2024 to 2025, from 393,227 MWh to 350,443 MWh. Through August 2026 it is running 100.0% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 393,227 |
| 2025 | 350,443 |
| 2026 through August | 0 |
| 2025, same months | 242,224 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 0 |
| July 2026 | 0 |
| June 2026 | 0 |
| May 2026 | 0 |
| April 2026 | 0 |
| March 2026 | 0 |
| February 2026 | 0 |
| January 2026 | 0 |
| December 2025 | 36,907 |
| November 2025 | 27,608 |
| October 2025 | 27,333 |
| September 2025 | 16,371 |
| August 2025 | 20,623 |
| July 2025 | 28,655 |
| June 2025 | 36,348 |
| May 2025 | 32,046 |
| April 2025 | 39,664 |
| March 2025 | 27,909 |
| February 2025 | 28,302 |
| January 2025 | 28,677 |
| December 2024 | 34,983 |
| November 2024 | 34,886 |
| October 2024 | 22,769 |
| September 2024 | 13,403 |
| August 2024 | 29,238 |
| July 2024 | 33,009 |
| June 2024 | 38,988 |
| May 2024 | 40,872 |
| April 2024 | 39,529 |
| March 2024 | 34,175 |
| February 2024 | 42,686 |
| January 2024 | 28,689 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Buffalo Gap 2 Wind Farm plant, and when do they retire?
1 operable generator totals 233 MW, with an average age of 18 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 233 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Onshore Wind Turbine | 233 | 2007 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Buffalo Gap 2 Wind Farm plant?
EIA lists no joint owners for Buffalo Gap 2 Wind Farm. AES Distributed Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Buffalo Gap 2 Wind Farm plant?
Buffalo Gap 2 Wind Farm is in Merkel, Nolan County, Texas, at 32.3182° N, 100.1770° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Buffalo Gap 2 Wind Farm's 233 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Monte Cristo 1 | Hidalgo | 239 | 168,089 |
| Rio Bravo Windpower, LLC | Starr | 238 | 652,255 |
| Chapman Ranch Wind I | Nueces | 236 | 544,278 |
| Buffalo Gap 2 Wind Farm | Nolan | 233 | 350,443 |
| Mariah del Norte | Parmer | 230 | 840,801 |
| Electra Wind Farm | Wilbarger | 230 | 812,090 |
| Horse Creek Wind Farm | Haskell | 230 | 820,021 |
Source: EIA Forms EIA-860 and EIA-923, 2025.