Wind power plant, Texas
Chapman Ranch Wind I power plant, Texas
Chapman Ranch Wind I is a 236 MW wind power plant in Nueces County, Texas, operated by Chapman Ranch Wind LLC, and it generated 544,278 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 22nd percentile of U.S. wind plants. By 2025 generation it ranks 1,259th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Chapman Ranch Wind I plant run compared with other wind plants?
The Chapman Ranch Wind I plant had a capacity factor of 25% in 2025 on 249 MW of net summer capacity, the 22nd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 91 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Chapman Ranch Wind I | 25% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Chapman Ranch Wind I plant generating more or less than last year?
Generation at Chapman Ranch Wind I rose 5.1% from 2024 to 2025, from 517,952 MWh to 544,278 MWh.
| Period | MWh |
|---|---|
| 2024 | 517,952 |
| 2025 | 544,278 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 36,514 |
| November 2025 | 56,422 |
| October 2025 | 25,561 |
| September 2025 | 25,466 |
| August 2025 | 29,699 |
| July 2025 | 52,181 |
| June 2025 | 45,501 |
| May 2025 | 58,341 |
| April 2025 | 69,632 |
| March 2025 | 48,486 |
| February 2025 | 44,197 |
| January 2025 | 52,278 |
| December 2024 | 51,097 |
| November 2024 | 38,113 |
| October 2024 | 32,727 |
| September 2024 | 26,651 |
| August 2024 | 21,900 |
| July 2024 | 27,573 |
| June 2024 | 43,103 |
| May 2024 | 51,947 |
| April 2024 | 63,175 |
| March 2024 | 54,537 |
| February 2024 | 57,967 |
| January 2024 | 49,162 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Chapman Ranch Wind I plant, and when do they retire?
1 operable generator totals 236 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 236 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CHA1 | Operating | Onshore Wind Turbine | 236 | 2017 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Chapman Ranch Wind I plant?
EIA lists no joint owners for Chapman Ranch Wind I. Chapman Ranch Wind LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Chapman Ranch Wind I plant?
Chapman Ranch Wind I is in Corpus Christi, Nueces County, Texas, at 27.5925° N, 97.5008° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Chapman Ranch Wind I's 236 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Blackjack Creek Wind Farm | Bee | 240 | 555,037 |
| Monte Cristo 1 | Hidalgo | 239 | 168,089 |
| Rio Bravo Windpower, LLC | Starr | 238 | 652,255 |
| Chapman Ranch Wind I | Nueces | 236 | 544,278 |
| Buffalo Gap 2 Wind Farm | Nolan | 233 | 350,443 |
| Mariah del Norte | Parmer | 230 | 840,801 |
| Electra Wind Farm | Wilbarger | 230 | 812,090 |
Source: EIA Forms EIA-860 and EIA-923, 2025.