Wind power plant, Texas
Buffalo Gap 3 Wind Farm, Texas
Buffalo Gap 3 Wind Farm is a 170 MW wind power plant in Nolan County, Texas, operated by AES Distributed Energy, and it generated 337,716 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 16th percentile of U.S. wind plants. By 2025 generation it ranks 1,819th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Buffalo Gap 3 Wind Farm plant run compared with other wind plants?
The Buffalo Gap 3 Wind Farm plant had a capacity factor of 23% in 2025 on 170 MW of net summer capacity, the 16th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 83 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Buffalo Gap 3 Wind Farm | 23% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Buffalo Gap 3 Wind Farm plant generating more or less than last year?
Generation at Buffalo Gap 3 Wind Farm rose 11.8% from 2024 to 2025, from 302,193 MWh to 337,716 MWh.
| Period | MWh |
|---|---|
| 2024 | 302,193 |
| 2025 | 337,716 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 35,874 |
| November 2025 | 25,945 |
| October 2025 | 28,077 |
| September 2025 | 17,458 |
| August 2025 | 20,490 |
| July 2025 | 27,613 |
| June 2025 | 34,864 |
| May 2025 | 28,263 |
| April 2025 | 39,497 |
| March 2025 | 25,850 |
| February 2025 | 27,143 |
| January 2025 | 26,642 |
| December 2024 | 29,493 |
| November 2024 | 31,120 |
| October 2024 | 18,382 |
| September 2024 | 10,236 |
| August 2024 | 21,721 |
| July 2024 | 26,747 |
| June 2024 | 30,108 |
| May 2024 | 28,790 |
| April 2024 | 27,381 |
| March 2024 | 23,282 |
| February 2024 | 30,765 |
| January 2024 | 24,168 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Buffalo Gap 3 Wind Farm plant, and when do they retire?
1 operable generator totals 170 MW, with an average age of 17 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 170 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN1 | Operating | Onshore Wind Turbine | 170 | 2008 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Buffalo Gap 3 Wind Farm plant?
EIA lists no joint owners for Buffalo Gap 3 Wind Farm. AES Distributed Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Buffalo Gap 3 Wind Farm plant?
Buffalo Gap 3 Wind Farm is in Nolan, Nolan County, Texas, at 32.2878° N, 100.1000° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Buffalo Gap 3 Wind Farm's 170 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Wildcat Creek Wind Farm LLC | Cooke | 175 | 447,073 |
| Salt Fork Wind Project, LLC | Donley | 174 | 679,536 |
| Appaloosa Run Wind | Upton | 172 | 699,112 |
| Buffalo Gap 3 Wind Farm | Nolan | 170 | 337,716 |
| Turkey Track Wind Energy LLC | Nolan | 170 | 331,425 |
| Desert Sky | Pecos | 168 | 541,153 |
| Hart Wind | Castro | 166 | 343,988 |
Source: EIA Forms EIA-860 and EIA-923, 2025.