Solar power plant, Georgia

Butler Solar Farm 20 power plant, Georgia

Butler Solar Farm 20 is a 22 MW solar power plant in Taylor County, Georgia, operated by Southern Power Co, and it generated 41,599 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 55th percentile of U.S. solar plants. By 2025 generation it ranks 4,307th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

22 MWNameplate capacity
24%Capacity factor, 2025, 55th percentile, on 20 MW net summer
4,307thU.S. rank by generation, 2025
9 yearsAverage generator age, by MW

How hard does the Butler Solar Farm 20 plant run compared with other solar plants?

The Butler Solar Farm 20 plant had a capacity factor of 24% in 2025 on 20 MW of net summer capacity, the 55th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 87 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Butler Solar Farm 2024%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Butler Solar Farm 20 plant generating more or less than last year?

Generation at Butler Solar Farm 20 rose 7.2% from 2024 to 2025, from 38,804 MWh to 41,599 MWh.

Net generation by period
PeriodMWh
202438,804
202541,599
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20252,473
November 20253,472
October 20253,389
September 20253,857
August 20253,351
July 20254,034
June 20253,734
May 20253,651
April 20253,887
March 20253,820
February 20252,959
January 20252,972
December 20242,698
November 20242,473
October 20243,958
September 20242,851
August 20244,184
July 20243,526
June 20244,015
May 20243,663
April 20243,974
March 20241,923
February 20242,921
January 20242,618

Source: EIA Form EIA-923, through August 2026.

How much of Georgia's electricity comes from the Butler Solar Farm 20 plant?

Butler Solar Farm 20 made 0.0% of the 144,967,352 MWh reported by Georgia plants in 2025, from 0.1% of the state's 42,719 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 119th largest of 263 plants in Georgia, the 4,688th largest of 14,327 in the U.S. and the 1,067th largest of 7,223 solar plants. By 2025 generation it is the 112th largest of 242 generating plants in the state.

Butler Solar Farm 20 within Georgia, 2025
MeasureThis plantGeorgiaShare
Capacity (MW)2242,7190.1%
Generation (MWh)41,599144,967,3520.0%
Solar capacity (MW)225,4140.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Butler Solar Farm 20 plant, and when do they retire?

1 operable generator totals 22 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s122100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic222016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Butler Solar Farm 20 plant?

SP Butler Solar Farm, LLC is the only joint owner reported for Butler Solar Farm 20, with 100.0%. Southern Power Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Butler Solar Farm 20 plant?

Butler Solar Farm 20 is in Butler, Taylor County, Georgia, at 32.5755° N, 84.3165° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Georgia are similar in size?

Georgia has 152 operable solar plants with 5,414 MW of capacity, and Butler Solar Farm 20's 22 MW is 0% of that.

Solar plants in Georgia around this size
PlantCountyMW2025 MWh
Kings Bay Solar FacilityCamden3042,822
Fort Stewart Solar FacilityLiberty3047,475
BaxleyAppling2557,334
Butler Solar Farm 20Taylor2241,599
Decatur County Solar ProjectDecatur2041,781
SR HazlehurstJeff Davis2030,541
Richland Solar CenterTwiggs2037,092

Source: EIA Forms EIA-860 and EIA-923, 2025.