Solar power plant, Georgia

Decatur County Solar Project, Georgia

Decatur County Solar Project is a 20 MW solar power plant in Decatur County, Georgia, operated by Southern Power Co, and it generated 41,781 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 65th percentile of U.S. solar plants. By 2025 generation it ranks 4,299th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
25%Capacity factor, 2025, 65th percentile, on 19 MW net summer
4,299thU.S. rank by generation, 2025
10 yearsAverage generator age, by MW

How hard does the Decatur County Solar Project plant run compared with other solar plants?

The Decatur County Solar Project plant had a capacity factor of 25% in 2025 on 19 MW of net summer capacity, the 65th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 92 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Decatur County Solar Project25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Decatur County Solar Project plant generating more or less than last year?

Generation at Decatur County Solar Project fell 0.9% from 2024 to 2025, from 42,175 MWh to 41,781 MWh.

Net generation by period
PeriodMWh
202442,175
202541,781
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20252,183
November 20251,950
October 20252,206
September 20254,504
August 20253,957
July 20254,653
June 20254,214
May 20254,183
April 20254,119
March 20254,160
February 20252,778
January 20252,874
December 20242,456
November 20241,708
October 20243,462
September 20242,875
August 20244,852
July 20244,290
June 20244,657
May 20244,240
April 20244,466
March 20243,500
February 20242,980
January 20242,689

Source: EIA Form EIA-923, through August 2026.

How much of Georgia's electricity comes from the Decatur County Solar Project plant?

Decatur County Solar Project made 0.0% of the 144,967,352 MWh reported by Georgia plants in 2025, from 0.0% of the state's 42,719 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 120th largest of 263 plants in Georgia, the 4,775th largest of 14,327 in the U.S. and the 1,126th largest of 7,223 solar plants. By 2025 generation it is the 110th largest of 242 generating plants in the state.

Decatur County Solar Project within Georgia, 2025
MeasureThis plantGeorgiaShare
Capacity (MW)2042,7190.0%
Generation (MWh)41,781144,967,3520.0%
Solar capacity (MW)205,4140.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Decatur County Solar Project plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
DCSP1OperatingSolar Photovoltaic202015n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Decatur County Solar Project plant?

SP Decatur County Solar, LLC is the only joint owner reported for Decatur County Solar Project, with 100.0%. Southern Power Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Decatur County Solar Project plant?

Decatur County Solar Project is in Bainbridge, Decatur County, Georgia, at 30.9650° N, 84.6261° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Georgia are similar in size?

Georgia has 152 operable solar plants with 5,414 MW of capacity, and Decatur County Solar Project's 20 MW is 0% of that.

Solar plants in Georgia around this size
PlantCountyMW2025 MWh
Fort Stewart Solar FacilityLiberty3047,475
BaxleyAppling2557,334
Butler Solar Farm 20Taylor2241,599
Decatur County Solar ProjectDecatur2041,781
SR HazlehurstJeff Davis2030,541
Richland Solar CenterTwiggs2037,092
SR Arlington IEarly2046,236

Source: EIA Forms EIA-860 and EIA-923, 2025.