Solar power plant, Georgia

Butler Solar Project 103 power plant, Georgia

Butler Solar Project 103 is a 104 MW solar power plant in Taylor County, Georgia, operated by Southern Power Co, and it generated 224,082 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Georgia, and its capacity factor sits at the 69th percentile of U.S. solar plants. By 2025 generation it ranks 2,348th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

104 MWNameplate capacity
26%Capacity factor, 2025, 69th percentile, on 100 MW net summer
0.2%Of GA generation, 2025
9 yearsAverage generator age, by MW

How hard does the Butler Solar Project 103 plant run compared with other solar plants?

The Butler Solar Project 103 plant had a capacity factor of 26% in 2025 on 100 MW of net summer capacity, the 69th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 93 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Butler Solar Project 10326%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Butler Solar Project 103 plant generating more or less than last year?

Generation at Butler Solar Project 103 rose 4.7% from 2024 to 2025, from 213,924 MWh to 224,082 MWh. Through August 2026 it is running 0.2% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024213,924
2025224,082
2026 through August158,801
2025, same months158,523
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202622,020
July 202624,228
June 202621,784
May 202620,873
April 202623,459
March 202620,725
February 202614,262
January 202611,450
December 202510,542
November 202515,731
October 202517,329
September 202521,957
August 202518,757
July 202524,312
June 202522,336
May 202521,441
April 202521,983
March 202521,197
February 202514,715
January 202513,782
December 202412,267
November 202411,239
October 202419,686
September 202413,592
August 202423,599
July 202420,107
June 202423,975
May 202423,323
April 202422,297
March 202417,284
February 202413,981
January 202412,574

Source: EIA Form EIA-923, through August 2026.

How much of Georgia's electricity comes from the Butler Solar Project 103 plant?

Butler Solar Project 103 made 0.2% of the 144,967,352 MWh reported by Georgia plants in 2025, from 0.2% of the state's 42,719 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 58th largest of 263 plants in Georgia, the 2,513th largest of 14,327 in the U.S. and the 419th largest of 7,223 solar plants. By 2025 generation it is the 51st largest of 242 generating plants in the state.

Butler Solar Project 103 within Georgia, 2025
MeasureThis plantGeorgiaShare
Capacity (MW)10442,7190.2%
Generation (MWh)224,082144,967,3520.2%
Solar capacity (MW)1045,4141.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Butler Solar Project 103 plant, and when do they retire?

1 operable generator totals 104 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1104100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic1042016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Butler Solar Project 103 plant?

SP Butler Solar, LLC is the only joint owner reported for Butler Solar Project 103, with 100.0%. Southern Power Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Butler Solar Project 103 plant?

Butler Solar Project 103 is in Butler, Taylor County, Georgia, at 32.5619° N, 84.2758° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Georgia are similar in size?

Georgia has 152 operable solar plants with 5,414 MW of capacity, and Butler Solar Project 103's 104 MW is 2% of that.

Solar plants in Georgia around this size
PlantCountyMW2025 MWh
SR Snipesville IIJeff Davis107249,999
SR Snipesville IIIJeff Davis107255,509
SR Clay, LLCClay106219,886
Butler Solar Project 103Taylor104224,082
SR Arlington IIEarly103228,798
White Pine Solar, LLCTaylor101187,859
SR LumpkinStewart100234,505

Source: EIA Forms EIA-860 and EIA-923, 2025.