Skip to main content
RateWatt

Solar power plant, Georgia

SR Arlington II solar power plant, Georgia

SR Arlington II is a 103 MW solar power plant in Early County, Georgia, operated by SR Arlington II MT, LLC, and it generated 228,798 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Georgia, and its capacity factor sits at the 68th percentile of U.S. solar plants. By 2025 generation it ranks 2,322nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

103 MWNameplate capacity
25%Capacity factor, 2025, 68th percentile, on 103 MW net summer
0.2%Of GA generation, 2025
6 yearsAverage generator age, by MW

How hard does the SR Arlington II plant run compared with other solar plants?

The SR Arlington II plant had a capacity factor of 25% in 2025 on 103 MW of net summer capacity, the 68th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 93 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
SR Arlington II25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the SR Arlington II plant generating more or less than last year?

Generation at SR Arlington II rose 2.9% from 2024 to 2025, from 222,344 MWh to 228,798 MWh. Through August 2026 it is running 16.2% behind the same months of 2025.

Net generation by period
PeriodMWh
2024222,344
2025228,798
2026 through August140,451
2025, same months167,695
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20264,476
July 202623,152
June 202621,793
May 202621,281
April 202619,338
March 202621,410
February 202615,640
January 202613,361
December 202511,187
November 202516,379
October 202516,400
September 202517,137
August 202519,820
July 202528,977
June 202522,146
May 202522,618
April 202523,871
March 202522,140
February 202514,078
January 202514,045
December 202412,873
November 202411,957
October 202418,768
September 202414,934
August 202426,203
July 202421,915
June 202423,836
May 202422,395
April 202424,122
March 202418,864
February 202413,149
January 202413,328

Source: EIA Form EIA-923, through August 2026.

How much of Georgia's electricity comes from the SR Arlington II plant?

SR Arlington II made 0.2% of the 144,967,352 MWh reported by Georgia plants in 2025, from 0.2% of the state's 42,719 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 59th largest of 263 plants in Georgia, the 2,541st largest of 14,327 in the U.S. and the 421st largest of 7,223 solar plants. By 2025 generation it is the 50th largest of 242 generating plants in the state.

SR Arlington II within Georgia, 2025
MeasureThis plantGeorgiaShare
Capacity (MW)10342,7190.2%
Generation (MWh)228,798144,967,3520.2%
Solar capacity (MW)1035,4141.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the SR Arlington II plant, and when do they retire?

1 operable generator totals 103 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1103100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
ARLIIOperatingSolar Photovoltaic1032019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the SR Arlington II plant?

EIA lists no joint owners for SR Arlington II. SR Arlington II MT, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the SR Arlington II plant?

SR Arlington II is in Blakely, Early County, Georgia, at 31.4155° N, 84.8307° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Georgia are similar in size?

Georgia has 152 operable solar plants with 5,414 MW of capacity, and SR Arlington II's 103 MW is 2% of that.

Solar plants in Georgia around this size
PlantCountyMW2025 MWh
SR Snipesville IIIJeff Davis107255,509
SR Clay, LLCClay106219,886
Butler Solar Project 103Taylor104224,082
SR Arlington IIEarly103228,798
White Pine Solar, LLCTaylor101187,859
SR LumpkinStewart100234,505
SnipesvilleJeff Davis86207,194

Source: EIA Forms EIA-860 and EIA-923, 2025.