Skip to main content
RateWatt

Natural gas power plant, Florida

C D McIntosh Jr natural gas power plant, Florida

C D McIntosh Jr is a 667 MW power plant, 662 MW of it natural gas, in Polk County, Florida, operated by City of Lakeland-(FL), and it generated 1,800,373 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.7% of the generation reported in Florida, and its capacity factor sits at the 60th percentile of U.S. natural gas plants. By 2025 generation it ranks 541st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

667 MWNameplate capacity
34%Capacity factor, 2025, natural gas units, 60th percentile, on 608 MW net summer
0.7%Of FL generation, 2025
17 yearsAverage generator age, by MW

How hard does the C D McIntosh Jr plant run compared with other natural gas plants?

The C D McIntosh Jr plant's natural gas units had a capacity factor of 34% in 2025 on 608 MW of net summer capacity, the 60th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 123 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
C D McIntosh Jr34%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its natural gas generators only. Values above 105% are left out of the comparison.

Is the C D McIntosh Jr plant generating more or less than last year?

Generation at C D McIntosh Jr fell 23.2% from 2024 to 2025, from 2,344,684 MWh to 1,800,373 MWh. Through August 2026 it is running 69.6% ahead of the same months of 2025.

Net generation by period
PeriodMWh
20242,344,684
20251,800,373
2026 through August1,678,006
2025, same months989,381
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026234,735
July 2026188,483
June 2026207,454
May 2026272,183
April 2026270,990
March 2026109,616
February 2026193,417
January 2026201,128
December 2025209,657
November 2025137,164
October 2025230,384
September 2025233,787
July 2025262,223
June 2025248,765
May 202588,865
April 202547,639
February 2025136,216
January 2025205,673
December 2024185,913
November 202471,071
October 2024224,961
September 2024222,772
August 2024215,003
July 2024234,965
June 2024223,834
May 2024245,891
April 2024233,499
March 2024149,434
February 2024135,442
January 2024201,899

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the C D McIntosh Jr plant?

C D McIntosh Jr made 0.7% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.8% of the state's 79,936 MW of capacity. By capacity it is the 34th largest of 331 plants in Florida, the 531st largest of 14,327 in the U.S. and the 321st largest of 1,962 natural gas plants on its natural gas units alone. By 2025 generation it is the 30th largest of 313 generating plants in the state.

C D McIntosh Jr within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)66779,9360.8%
Generation (MWh)1,800,373267,867,7350.7%
Natural gas capacity (MW)66252,8941.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the C D McIntosh Jr plant, and when do they retire?

12 operable generators total 666 MW, with an average age of 17 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 3 have already retired, totalling 593 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1970s3325%none reported
2000s238458%none reported
2020s725138%none reported
Every generator, 17 in all
UnitStatusTechnologyMWIn servicePlanned retirement
IC1OperatingPetroleum Liquids31970n/a
IC2OperatingPetroleum Liquids31970n/a
GT1OperatingNatural Gas Fired Combustion Turbine271973n/a
5CTOperatingNatural Gas Fired Combined Cycle2492001n/a
5STOperatingNatural Gas Fired Combined Cycle1352002n/a
GT2OperatingNatural Gas Fired Combustion Turbine1302020n/a
IC6OperatingNatural Gas Internal Combustion Engine202024n/a
IC7OperatingNatural Gas Internal Combustion Engine202024n/a
IC8OperatingNatural Gas Internal Combustion Engine202024n/a
IC3OperatingNatural Gas Internal Combustion Engine202025n/a
IC4OperatingNatural Gas Internal Combustion Engine202025n/a
IC5OperatingNatural Gas Internal Combustion Engine202025n/a
ST1RetiredNatural Gas Steam Turbine10419712015
ST2RetiredNatural Gas Steam Turbine12619762020
3RetiredConventional Steam Coal36419822021
4CancelledPetroleum Coke288n/an/a
PV6CancelledSolar Photovoltaic16n/an/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the C D McIntosh Jr plant?

EIA lists no joint owners for C D McIntosh Jr. City of Lakeland-(FL) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does City of Lakeland charge homes?

City of Lakeland, the operator of C D McIntosh Jr, had an average residential price of 11.73¢ per kWh and an average bill of $136 a month in 2025, 23% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
City of Lakeland11.73¢$13623% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

What fuels does the C D McIntosh Jr plant use?

C D McIntosh Jr has capacity on 2 fuels: 99% natural gas and 1% petroleum. In 2025, natural gas made 100% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Natural gas66299.2%1,798,247
Petroleum50.8%2,126

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the C D McIntosh Jr plant?

C D McIntosh Jr is in Lakeland, Polk County, Florida, at 28.0801° N, 81.9229° W. It sits in the Florida Municipal Power Pool balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Florida are similar in size?

Florida has 68 operable natural gas plants with 52,894 MW of capacity, and C D McIntosh Jr's 662 MW is 1% of that.

Natural gas plants in Florida around this size
PlantCountyMW2025 MWh
Cane IslandOsceola7064,017,050
Curtis H Stanton Energy CenterOrange6883,477,956
Arvah B HopkinsLeon6731,642,172
C D McIntosh JrPolk6621,798,247
Osprey Energy Center Power PlantPolk6443,651,198
Lansing SmithBay6203,747,743
Indian RiverBrevard609n/a

Source: EIA Forms EIA-860 and EIA-923, 2025.