Skip to main content
RateWatt

Natural gas power plant, Florida

Osprey Energy Center Power Plant, Florida

Osprey Energy Center Power Plant is a 644 MW natural gas power plant in Polk County, Florida, operated by Duke Energy Florida, LLC, and it generated 3,651,198 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.4% of the generation reported in Florida, and its capacity factor sits at the 83rd percentile of U.S. natural gas plants. By 2025 generation it ranks 320th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

644 MWNameplate capacity
68%Capacity factor, 2025, 83rd percentile, on 616 MW net summer
1.4%Of FL generation, 2025
21 yearsAverage generator age, by MW

How hard does Osprey Energy Center Power Plant run compared with other natural gas plants?

Osprey Energy Center Power Plant had a capacity factor of 68% in 2025 on 616 MW of net summer capacity, the 83rd percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 247 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Osprey Energy Center Power Plant68%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Osprey Energy Center Power Plant generating more or less than last year?

Osprey Energy Center Power Plant generated 3,651,198 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 12.2% behind the same months of 2025. 2024 has output for only 11 months, so the two years are not compared.

Net generation by period
PeriodMWh
20243,131,131
20253,651,198
2026 through August2,135,628
2025, same months2,431,604
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026343,797
July 2026382,219
June 2026365,659
May 2026107,197
April 2026369,302
March 2026325,671
February 20260
January 2026241,783
December 2025335,970
November 2025231,978
October 2025388,525
September 2025263,121
August 2025365,759
July 2025377,158
June 2025352,537
May 2025321,987
April 20251,968
March 2025352,445
February 2025319,462
January 2025340,288
December 2024374,693
November 2024351,611
October 2024329,558
September 2024363,629
August 2024371,281
July 2024367,260
June 2024264,642
May 2024216,224
April 20240
March 2024187,259
February 2024215,615
January 202489,359

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from Osprey Energy Center Power Plant?

Osprey Energy Center Power Plant made 1.4% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.8% of the state's 79,936 MW of capacity. Its share of output is 1.7 times its share of capacity. By capacity it is the 36th largest of 331 plants in Florida, the 553rd largest of 14,327 in the U.S. and the 335th largest of 1,962 natural gas plants. By 2025 generation it is the 24th largest of 313 generating plants in the state.

Osprey Energy Center Power Plant within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)64479,9360.8%
Generation (MWh)3,651,198267,867,7351.4%
Natural gas capacity (MW)64452,8941.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Osprey Energy Center Power Plant, and when do they retire?

3 operable generators total 644 MW, with an average age of 21 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s3644100%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
OEC1OperatingNatural Gas Fired Combined Cycle1922004n/a
OEC2OperatingNatural Gas Fired Combined Cycle1922004n/a
OECSOperatingNatural Gas Fired Combined Cycle2602004n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Osprey Energy Center Power Plant?

EIA lists no joint owners for Osprey Energy Center Power Plant. Duke Energy Florida, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Duke Energy Florida, LLC charge homes?

Duke Energy Florida, LLC, the operator of Osprey Energy Center Power Plant, had an average residential price of 18.36¢ per kWh and an average bill of $185 a month in 2025, 21% above the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Duke Energy Florida, LLC18.36¢$18521% higher
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is Osprey Energy Center Power Plant?

Osprey Energy Center Power Plant is in Auburndale, Polk County, Florida, at 28.0525° N, 81.8083° W. It sits in the Tampa Electric Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Florida are similar in size?

Florida has 68 operable natural gas plants with 52,894 MW of capacity, and Osprey Energy Center Power Plant's 644 MW is 1% of that.

Natural gas plants in Florida around this size
PlantCountyMW2025 MWh
Curtis H Stanton Energy CenterOrange6883,477,956
Arvah B HopkinsLeon6731,642,172
C D McIntosh JrPolk6621,798,247
Osprey Energy Center Power PlantPolk6443,651,198
Lansing SmithBay6203,747,743
Indian RiverBrevard609n/a
Osceola Generating Station (FL)Osceola5803,167

Source: EIA Forms EIA-860 and EIA-923, 2025.