Skip to main content
RateWatt

Natural gas power plant, New York

Caithness Long Island Energy Center, New York

Caithness Long Island Energy Center is a 349 MW natural gas power plant in Suffolk County, New York, operated by Caithness Long Island, LLC, and it generated 2,387,956 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.8% of the generation reported in New York, and its capacity factor sits at the 97th percentile of U.S. natural gas plants. By 2025 generation it ranks 454th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

349 MWNameplate capacity
86%Capacity factor, 2025, 97th percentile, on 317 MW net summer
1.8%Of NY generation, 2025
16 yearsAverage generator age, by MW

How hard does the Caithness Long Island Energy Center plant run compared with other natural gas plants?

The Caithness Long Island Energy Center plant had a capacity factor of 86% in 2025 on 317 MW of net summer capacity, the 97th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 314 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Caithness Long Island Energy Center86%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Caithness Long Island Energy Center plant generating more or less than last year?

Caithness Long Island Energy Center generated 2,387,956 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 9.5% behind the same months of 2025. 2024 has output for only 10 months, so the two years are not compared.

1 month shows net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.

Net generation by period
PeriodMWh
20241,853,121
20252,387,956
2026 through August1,443,565
2025, same months1,595,755
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026109,802
July 2026209,452
June 2026196,577
May 2026144,635
April 2026204,533
March 2026160,321
February 2026189,557
January 2026228,688
December 2025231,455
November 2025216,685
October 2025145,970
September 2025198,091
August 2025172,650
July 2025181,140
June 2025208,177
May 2025144,775
April 2025205,966
March 2025217,475
February 2025222,344
January 2025243,228
December 2024236,673
November 2024215,621
October 2024204,591
September 2024205,619
August 2024214,608
July 202485,157
June 20240
May 2024-451
April 202435,191
March 2024216,896
February 2024213,541
January 2024225,675

Source: EIA Form EIA-923, through August 2026.

How much of New York's electricity comes from the Caithness Long Island Energy Center plant?

Caithness Long Island Energy Center made 1.8% of the 130,607,810 MWh reported by New York plants in 2025, from 0.8% of the state's 44,194 MW of capacity. Its share of output is 2.3 times its share of capacity. By capacity it is the 31st largest of 1,145 plants in New York, the 933rd largest of 14,327 in the U.S. and the 562nd largest of 1,962 natural gas plants. By 2025 generation it is the 17th largest of 1,049 generating plants in the state.

Caithness Long Island Energy Center within New York, 2025
MeasureThis plantNew YorkShare
Capacity (MW)34944,1940.8%
Generation (MWh)2,387,956130,607,8101.8%
Natural gas capacity (MW)34924,2551.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Caithness Long Island Energy Center plant, and when do they retire?

2 operable generators total 349 MW, with an average age of 16 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s2349100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CT01OperatingNatural Gas Fired Combined Cycle1962009n/a
ST01OperatingNatural Gas Fired Combined Cycle1532009n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Caithness Long Island Energy Center plant?

EIA lists no joint owners for Caithness Long Island Energy Center. Caithness Long Island, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Caithness Long Island Energy Center plant?

Caithness Long Island Energy Center is in Yaphank, Suffolk County, New York, at 40.8142° N, 72.9403° W. It sits in the New York Independent System Operator balancing area (NERC region NPCC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in New York are similar in size?

New York has 104 operable natural gas plants with 24,255 MW of capacity, and Caithness Long Island Energy Center's 349 MW is 1% of that.

Natural gas plants in New York around this size
PlantCountyMW2025 MWh
Port JeffersonSuffolk482307,181
Selkirk CogenAlbany446346,366
Narrows Gas Turbines GeneratingKings352137,925
Caithness Long Island Energy CenterSuffolk3492,387,777
Brooklyn Navy Yard CogenerationKings3221,876,994
Gowanus Gas Turbines GeneratingKings32052,937
Saranac FacilityClinton286387,014

Source: EIA Forms EIA-860 and EIA-923, 2025.