Port Jefferson is a 498 MW power plant, 482 MW of it natural gas, in Suffolk County, New York, operated by National Grid Generation LLC, and it generated 337,718 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in New York, and its capacity factor sits at the 30th percentile of U.S. natural gas plants. By 2025 generation it ranks 1,818th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

498 MWNameplate capacity
7%Capacity factor, 2025, natural gas units, 30th percentile, on 468 MW net summer
0.3%Of NY generation, 2025
57 yearsAverage generator age, by MW

How hard does the Port Jefferson plant run compared with other natural gas plants?

The Port Jefferson plant's natural gas units had a capacity factor of 7% in 2025 on 468 MW of net summer capacity, the 30th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 27 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Port Jefferson7%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its natural gas generators only. Values above 105% are left out of the comparison.

Is the Port Jefferson plant generating more or less than last year?

Generation at Port Jefferson rose 3.3% from 2024 to 2025, from 326,984 MWh to 337,718 MWh. Through August 2026 it is running 48.7% ahead of the same months of 2025.

1 month shows net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.

Net generation by period
PeriodMWh
2024326,984
2025337,718
2026 through August316,287
2025, same months212,694
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202677,515
July 202677,056
June 202637,499
May 202617,996
April 202610,756
March 20265,108
February 202644,707
January 202645,650
December 202524,363
November 202549,941
October 202534,585
September 202516,135
August 202539,853
July 202587,217
June 202539,775
May 20255,722
April 20251,215
March 2025-142
February 202516,749
January 202522,305
December 20241,994
November 20243,678
October 202411,981
September 20245,699
August 202443,306
July 2024107,353
June 202480,838
May 202429,918
April 20249,221
March 20245,943
February 20244,341
January 202422,712

Source: EIA Form EIA-923, through August 2026.

How much of New York's electricity comes from the Port Jefferson plant?

Port Jefferson made 0.3% of the 130,607,810 MWh reported by New York plants in 2025, from 1.1% of the state's 44,194 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 28th largest of 1,145 plants in New York, the 741st largest of 14,327 in the U.S. and the 473rd largest of 1,962 natural gas plants on its natural gas units alone. By 2025 generation it is the 41st largest of 1,049 generating plants in the state.

Port Jefferson within New York, 2025
MeasureThis plantNew YorkShare
Capacity (MW)49844,1941.1%
Generation (MWh)337,718130,607,8100.3%
Natural gas capacity (MW)48224,2552.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Port Jefferson plant, and when do they retire?

5 operable generators total 498 MW, with an average age of 57 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 2 have already retired, totalling 92 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1950s118838%none reported
1960s220441%none reported
2000s210621%none reported
Every generator, 7 in all
UnitStatusTechnologyMWIn servicePlanned retirement
3OperatingNatural Gas Steam Turbine1881958n/a
4OperatingNatural Gas Steam Turbine1881960n/a
GT1OperatingPetroleum Liquids161966n/a
GT2OperatingNatural Gas Fired Combustion Turbine532002n/a
GT3OperatingNatural Gas Fired Combustion Turbine532002n/a
ST1RetiredPetroleum Liquids4619481997
2RetiredPetroleum Liquids4619501997

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Port Jefferson plant?

EIA lists no joint owners for Port Jefferson. National Grid Generation LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Port Jefferson plant use?

Port Jefferson has capacity on 2 fuels: 97% natural gas and 3% petroleum. In 2025, natural gas made 91% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Natural gas48296.8%307,181
Petroleum163.2%30,537

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Port Jefferson plant?

Port Jefferson is in Port Jefferson, Suffolk County, New York, at 40.9497° N, 73.0785° W. It sits in the New York Independent System Operator balancing area (NERC region NPCC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in New York are similar in size?

New York has 104 operable natural gas plants with 24,255 MW of capacity, and Port Jefferson's 482 MW is 2% of that.

Natural gas plants in New York around this size
PlantCountyMW2025 MWh
Astoria EnergyQueens5953,825,278
Danskammer Generating StationOrange53226,554
ZeltmannQueens5282,632,176
Port JeffersonSuffolk482307,181
Selkirk CogenAlbany446346,366
Narrows Gas Turbines GeneratingKings352137,925
Caithness Long Island Energy CenterSuffolk3492,387,777

Source: EIA Forms EIA-860 and EIA-923, 2025.