Wind power plant, Illinois
Cardinal Point Wind power plant, Illinois
Cardinal Point Wind is a 150 MW wind power plant in McDonough County, Illinois, operated by Cardinal Point LLC, and it generated 510,280 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Illinois, and its capacity factor sits at the 69th percentile of U.S. wind plants. By 2025 generation it ranks 1,317th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Cardinal Point Wind plant run compared with other wind plants?
The Cardinal Point Wind plant had a capacity factor of 39% in 2025 on 150 MW of net summer capacity, the 69th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 142 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Cardinal Point Wind | 39% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Cardinal Point Wind plant generating more or less than last year?
Generation at Cardinal Point Wind fell 4.6% from 2024 to 2025, from 535,069 MWh to 510,280 MWh. Through August 2026 it is running 4.4% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 535,069 |
| 2025 | 510,280 |
| 2026 through August | 343,535 |
| 2025, same months | 328,949 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 19,344 |
| July 2026 | 18,392 |
| June 2026 | 34,393 |
| May 2026 | 39,412 |
| April 2026 | 58,890 |
| March 2026 | 64,231 |
| February 2026 | 52,258 |
| January 2026 | 56,615 |
| December 2025 | 57,405 |
| November 2025 | 54,505 |
| October 2025 | 51,633 |
| September 2025 | 17,788 |
| August 2025 | 19,676 |
| July 2025 | 18,635 |
| June 2025 | 30,356 |
| May 2025 | 39,964 |
| April 2025 | 50,949 |
| March 2025 | 64,311 |
| February 2025 | 51,416 |
| January 2025 | 53,642 |
| December 2024 | 56,665 |
| November 2024 | 49,149 |
| October 2024 | 56,130 |
| September 2024 | 25,878 |
| August 2024 | 20,898 |
| July 2024 | 18,309 |
| June 2024 | 38,094 |
| May 2024 | 40,562 |
| April 2024 | 63,916 |
| March 2024 | 68,895 |
| February 2024 | 52,548 |
| January 2024 | 44,025 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Cardinal Point Wind plant, and when do they retire?
1 operable generator totals 150 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 150 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN | Operating | Onshore Wind Turbine | 150 | 2020 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Cardinal Point Wind plant?
EIA lists no joint owners for Cardinal Point Wind. Cardinal Point LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Cardinal Point Wind plant?
Cardinal Point Wind is in Sciota, McDonough County, Illinois, at 40.5886° N, 90.7518° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Illinois are similar in size?
Illinois has 55 operable wind plants with 8,458 MW of capacity, and Cardinal Point Wind's 150 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Pioneer Trail Wind Farm, LLC | Iroquois | 150 | 470,405 |
| Camp Grove Wind Farm | STARK | 150 | 406,115 |
| White Oak Energy LLC | McLean | 150 | 399,881 |
| Cardinal Point Wind | McDonough | 150 | 510,280 |
| Otter Creek Wind Farm LLC | LaSalle | 150 | 450,075 |
| Ford County Wind Farm LLC | Ford | 121 | 464,720 |
| Bishop Hill III | Henry | 119 | 428,702 |
Source: EIA Forms EIA-860 and EIA-923, 2025.