Wind power plant, Illinois
Ford County Wind Farm LLC power plant, Illinois
Ford County Wind Farm LLC is a 121 MW wind power plant in Ford County, Illinois, operated by Ford Ridge, and it generated 464,720 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Illinois, and its capacity factor sits at the 87th percentile of U.S. wind plants. By 2025 generation it ranks 1,420th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Ford County Wind Farm LLC plant run compared with other wind plants?
The Ford County Wind Farm LLC plant had a capacity factor of 44% in 2025 on 121 MW of net summer capacity, the 87th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 160 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Ford County Wind Farm LLC | 44% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Ford County Wind Farm LLC plant generating more or less than last year?
Generation at Ford County Wind Farm LLC fell 2.6% from 2024 to 2025, from 477,142 MWh to 464,720 MWh. Through August 2026 it is running 2.2% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 477,142 |
| 2025 | 464,720 |
| 2026 through August | 316,655 |
| 2025, same months | 309,970 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 18,947 |
| July 2026 | 17,740 |
| June 2026 | 32,818 |
| May 2026 | 39,753 |
| April 2026 | 56,041 |
| March 2026 | 56,255 |
| February 2026 | 41,269 |
| January 2026 | 53,832 |
| December 2025 | 51,864 |
| November 2025 | 46,325 |
| October 2025 | 37,659 |
| September 2025 | 18,902 |
| August 2025 | 20,080 |
| July 2025 | 17,757 |
| June 2025 | 28,764 |
| May 2025 | 42,896 |
| April 2025 | 41,120 |
| March 2025 | 59,996 |
| February 2025 | 45,211 |
| January 2025 | 54,146 |
| December 2024 | 51,939 |
| November 2024 | 48,858 |
| October 2024 | 41,283 |
| September 2024 | 20,000 |
| August 2024 | 21,347 |
| July 2024 | 19,821 |
| June 2024 | 38,736 |
| May 2024 | 36,417 |
| April 2024 | 54,666 |
| March 2024 | 56,711 |
| February 2024 | 44,720 |
| January 2024 | 42,644 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Ford County Wind Farm LLC plant, and when do they retire?
1 operable generator totals 121 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 121 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| FORDC | Operating | Onshore Wind Turbine | 121 | 2022 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Ford County Wind Farm LLC plant?
EIA lists no joint owners for Ford County Wind Farm LLC. Ford Ridge operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Ford County Wind Farm LLC plant?
Ford County Wind Farm LLC is in Ford County, Ford County, Illinois, at 40.5563° N, 88.3495° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Illinois are similar in size?
Illinois has 55 operable wind plants with 8,458 MW of capacity, and Ford County Wind Farm LLC's 121 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| White Oak Energy LLC | McLean | 150 | 399,881 |
| Cardinal Point Wind | McDonough | 150 | 510,280 |
| Otter Creek Wind Farm LLC | LaSalle | 150 | 450,075 |
| Ford County Wind Farm LLC | Ford | 121 | 464,720 |
| Bishop Hill III | Henry | 119 | 428,702 |
| Shady Oaks Wind Farm | Lee | 110 | 302,309 |
| Shady Oaks Wind 2 | Lee | 108 | 318,179 |
Source: EIA Forms EIA-860 and EIA-923, 2025.