Wind power plant, Illinois
Shady Oaks Wind 2 power plant, Illinois
Shady Oaks Wind 2 is a 108 MW wind power plant in Lee County, Illinois, operated by Shady Oaks Wind 2, LLC, and it generated 318,179 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Illinois, and its capacity factor sits at the 52nd percentile of U.S. wind plants. By 2025 generation it ranks 1,899th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Shady Oaks Wind 2 plant run compared with other wind plants?
The Shady Oaks Wind 2 plant had a capacity factor of 34% in 2025 on 108 MW of net summer capacity, the 52nd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 122 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Shady Oaks Wind 2 | 34% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Shady Oaks Wind 2 plant generating more or less than last year?
Generation at Shady Oaks Wind 2 fell 5.3% from 2024 to 2025, from 336,147 MWh to 318,179 MWh. Through August 2026 it is running 5.6% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 336,147 |
| 2025 | 318,179 |
| 2026 through August | 207,703 |
| 2025, same months | 220,094 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 13,712 |
| July 2026 | 11,510 |
| June 2026 | 23,274 |
| May 2026 | 23,655 |
| April 2026 | 27,005 |
| March 2026 | 40,037 |
| February 2026 | 30,341 |
| January 2026 | 38,169 |
| December 2025 | 35,791 |
| November 2025 | 19,103 |
| October 2025 | 30,404 |
| September 2025 | 12,787 |
| August 2025 | 12,750 |
| July 2025 | 11,851 |
| June 2025 | 18,269 |
| May 2025 | 26,421 |
| April 2025 | 36,137 |
| March 2025 | 44,750 |
| February 2025 | 31,740 |
| January 2025 | 38,176 |
| December 2024 | 34,331 |
| November 2024 | 36,008 |
| October 2024 | 34,843 |
| September 2024 | 17,427 |
| August 2024 | 14,156 |
| July 2024 | 10,644 |
| June 2024 | 25,659 |
| May 2024 | 24,283 |
| April 2024 | 40,889 |
| March 2024 | 43,494 |
| February 2024 | 29,070 |
| January 2024 | 25,343 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Shady Oaks Wind 2 plant, and when do they retire?
1 operable generator totals 108 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 108 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SHO02 | Operating | Onshore Wind Turbine | 108 | 2023 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Shady Oaks Wind 2 plant?
EIA lists no joint owners for Shady Oaks Wind 2. Shady Oaks Wind 2, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Shady Oaks Wind 2 plant?
Shady Oaks Wind 2 is in Compton, Lee County, Illinois, at 41.6665° N, 89.0598° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Illinois are similar in size?
Illinois has 55 operable wind plants with 8,458 MW of capacity, and Shady Oaks Wind 2's 108 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Ford County Wind Farm LLC | Ford | 121 | 464,720 |
| Bishop Hill III | Henry | 119 | 428,702 |
| Shady Oaks Wind Farm | Lee | 110 | 302,309 |
| Shady Oaks Wind 2 | Lee | 108 | 318,179 |
| Blackstone Wind Farm LLC | Livingston | 106 | 237,659 |
| Midland Wind | Henry | 106 | 346,152 |
| EcoGrove Wind LLC | Stephenson | 101 | 251,054 |
Source: EIA Forms EIA-860 and EIA-923, 2025.