Shady Oaks Wind 2 power plant, Illinois

Shady Oaks Wind 2 is a 108 MW wind power plant in Lee County, Illinois, operated by Shady Oaks Wind 2, LLC, and it generated 318,179 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Illinois, and its capacity factor sits at the 52nd percentile of U.S. wind plants. By 2025 generation it ranks 1,899th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

108 MWNameplate capacity
34%Capacity factor, 2025, 52nd percentile, on 108 MW net summer
0.2%Of IL generation, 2025
2 yearsAverage generator age, by MW

How hard does the Shady Oaks Wind 2 plant run compared with other wind plants?

The Shady Oaks Wind 2 plant had a capacity factor of 34% in 2025 on 108 MW of net summer capacity, the 52nd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 122 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Shady Oaks Wind 234%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Shady Oaks Wind 2 plant generating more or less than last year?

Generation at Shady Oaks Wind 2 fell 5.3% from 2024 to 2025, from 336,147 MWh to 318,179 MWh. Through August 2026 it is running 5.6% behind the same months of 2025.

Net generation by period
PeriodMWh
2024336,147
2025318,179
2026 through August207,703
2025, same months220,094
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202613,712
July 202611,510
June 202623,274
May 202623,655
April 202627,005
March 202640,037
February 202630,341
January 202638,169
December 202535,791
November 202519,103
October 202530,404
September 202512,787
August 202512,750
July 202511,851
June 202518,269
May 202526,421
April 202536,137
March 202544,750
February 202531,740
January 202538,176
December 202434,331
November 202436,008
October 202434,843
September 202417,427
August 202414,156
July 202410,644
June 202425,659
May 202424,283
April 202440,889
March 202443,494
February 202429,070
January 202425,343

Source: EIA Form EIA-923, through August 2026.

How much of Illinois' electricity comes from the Shady Oaks Wind 2 plant?

Shady Oaks Wind 2 made 0.2% of the 191,710,915 MWh reported by Illinois plants in 2025, from 0.2% of the state's 52,515 MW of capacity. By capacity it is the 99th largest of 602 plants in Illinois, the 2,460th largest of 14,327 in the U.S. and the 596th largest of 1,358 wind plants. By 2025 generation it is the 67th largest of 531 generating plants in the state.

Shady Oaks Wind 2 within Illinois, 2025
MeasureThis plantIllinoisShare
Capacity (MW)10852,5150.2%
Generation (MWh)318,179191,710,9150.2%
Wind capacity (MW)1088,4581.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Shady Oaks Wind 2 plant, and when do they retire?

1 operable generator totals 108 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1108100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
SHO02OperatingOnshore Wind Turbine1082023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Shady Oaks Wind 2 plant?

EIA lists no joint owners for Shady Oaks Wind 2. Shady Oaks Wind 2, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Shady Oaks Wind 2 plant?

Shady Oaks Wind 2 is in Compton, Lee County, Illinois, at 41.6665° N, 89.0598° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Illinois are similar in size?

Illinois has 55 operable wind plants with 8,458 MW of capacity, and Shady Oaks Wind 2's 108 MW is 1% of that.

Wind plants in Illinois around this size
PlantCountyMW2025 MWh
Ford County Wind Farm LLCFord121464,720
Bishop Hill IIIHenry119428,702
Shady Oaks Wind FarmLee110302,309
Shady Oaks Wind 2Lee108318,179
Blackstone Wind Farm LLCLivingston106237,659
Midland WindHenry106346,152
EcoGrove Wind LLCStephenson101251,054

Source: EIA Forms EIA-860 and EIA-923, 2025.