Solar power plant, California
Catalina Solar LLC power plant, California
Catalina Solar LLC is a 110 MW solar power plant in Kern County, California, operated by EDF Renewable Asset Holdings, Inc., and it generated 249,040 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 70th percentile of U.S. solar plants. By 2025 generation it ranks 2,240th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Catalina Solar LLC plant run compared with other solar plants?
The Catalina Solar LLC plant had a capacity factor of 26% in 2025 on 110 MW of net summer capacity, the 70th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 94 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Catalina Solar LLC | 26% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Catalina Solar LLC plant generating more or less than last year?
Generation at Catalina Solar LLC fell 5.0% from 2024 to 2025, from 262,226 MWh to 249,040 MWh.
| Period | MWh |
|---|---|
| 2024 | 262,226 |
| 2025 | 249,040 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 0 |
| November 2025 | 14,366 |
| October 2025 | 22,553 |
| September 2025 | 22,027 |
| August 2025 | 25,002 |
| July 2025 | 27,165 |
| June 2025 | 26,396 |
| May 2025 | 26,611 |
| April 2025 | 25,375 |
| March 2025 | 22,742 |
| February 2025 | 18,257 |
| January 2025 | 18,546 |
| December 2024 | 15,904 |
| November 2024 | 17,474 |
| October 2024 | 21,889 |
| September 2024 | 23,580 |
| August 2024 | 25,972 |
| July 2024 | 25,743 |
| June 2024 | 26,157 |
| May 2024 | 24,802 |
| April 2024 | 25,373 |
| March 2024 | 22,162 |
| February 2024 | 16,464 |
| January 2024 | 16,706 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Catalina Solar LLC plant, and when do they retire?
1 operable generator totals 110 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 110 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| INV | Operating | Solar Photovoltaic | 110 | 2012 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Catalina Solar LLC plant?
EIA lists no joint owners for Catalina Solar LLC. EDF Renewable Asset Holdings, Inc. operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Catalina Solar LLC plant?
Catalina Solar LLC is in Rosamond, Kern County, California, at 34.9383° N, 118.3345° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Catalina Solar LLC's 110 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Maverick Solar, LLC | Riverside | 125 | 369,726 |
| Raceway Solar & Storage | Los Angeles | 125 | 376,342 |
| Valentine Solar, LLC | Kern | 111 | 287,689 |
| Catalina Solar LLC | Kern | 110 | 249,040 |
| Blythe Solar 110, LLC | Riverside | 110 | 293,129 |
| Quinto Solar PV Project | Merced | 108 | 242,546 |
| Willow Spring Solar, LLC | Kern | 108 | 251,421 |
Source: EIA Forms EIA-860 and EIA-923, 2025.