Quinto Solar PV Project is a 108 MW solar power plant in Merced County, California, operated by Arevon Energy, Inc., and it generated 242,546 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 73rd percentile of U.S. solar plants. By 2025 generation it ranks 2,267th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Quinto Solar PV Project plant run compared with other solar plants?
The Quinto Solar PV Project plant had a capacity factor of 26% in 2025 on 105 MW of net summer capacity, the 73rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 96 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Quinto Solar PV Project | 26% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Quinto Solar PV Project plant generating more or less than last year?
Generation at Quinto Solar PV Project fell 5.6% from 2024 to 2025, from 256,991 MWh to 242,546 MWh.
| Period | MWh |
|---|---|
| 2024 | 256,991 |
| 2025 | 242,546 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 4,209 |
| November 2025 | 9,549 |
| October 2025 | 18,291 |
| September 2025 | 19,694 |
| August 2025 | 28,581 |
| July 2025 | 33,130 |
| June 2025 | 30,405 |
| May 2025 | 32,760 |
| April 2025 | 24,972 |
| March 2025 | 18,474 |
| February 2025 | 13,075 |
| January 2025 | 9,406 |
| December 2024 | 4,267 |
| November 2024 | 13,141 |
| October 2024 | 19,255 |
| September 2024 | 25,645 |
| August 2024 | 30,878 |
| July 2024 | 31,120 |
| June 2024 | 34,453 |
| May 2024 | 33,382 |
| April 2024 | 26,239 |
| March 2024 | 19,100 |
| February 2024 | 10,671 |
| January 2024 | 8,840 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Quinto Solar PV Project plant, and when do they retire?
1 operable generator totals 108 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 108 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SSC13 | Operating | Solar Photovoltaic | 108 | 2015 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Quinto Solar PV Project plant?
EIA lists no joint owners for Quinto Solar PV Project. Arevon Energy, Inc. operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Quinto Solar PV Project plant?
Quinto Solar PV Project is in Gustine, Merced County, California, at 37.1303° N, 121.0522° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Quinto Solar PV Project's 108 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Valentine Solar, LLC | Kern | 111 | 287,689 |
| Catalina Solar LLC | Kern | 110 | 249,040 |
| Blythe Solar 110, LLC | Riverside | 110 | 293,129 |
| Quinto Solar PV Project | Merced | 108 | 242,546 |
| Willow Spring Solar, LLC | Kern | 108 | 251,421 |
| Wistaria Ranch Solar | Imperial | 107 | 288,908 |
| Springbok Solar Farm 1 | Kern | 105 | 280,434 |