Solar power plant, California
Wistaria Ranch Solar power plant, California
Wistaria Ranch Solar is a 107 MW solar power plant in Imperial County, California, operated by RWE Clean Energy, and it generated 288,908 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 98th percentile of U.S. solar plants. By 2025 generation it ranks 2,024th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Wistaria Ranch Solar plant run compared with other solar plants?
The Wistaria Ranch Solar plant had a capacity factor of 33% in 2025 on 100 MW of net summer capacity, the 98th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 120 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Wistaria Ranch Solar | 33% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Wistaria Ranch Solar plant generating more or less than last year?
Generation at Wistaria Ranch Solar fell 1.0% from 2024 to 2025, from 291,950 MWh to 288,908 MWh. Through August 2026 it is running 9.9% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 291,950 |
| 2025 | 288,908 |
| 2026 through August | 186,995 |
| 2025, same months | 207,503 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 25,553 |
| July 2026 | 28,151 |
| June 2026 | 28,542 |
| May 2026 | 28,109 |
| April 2026 | 18,266 |
| March 2026 | 23,277 |
| February 2026 | 18,832 |
| January 2026 | 16,265 |
| December 2025 | 14,917 |
| November 2025 | 16,381 |
| October 2025 | 25,185 |
| September 2025 | 24,922 |
| August 2025 | 25,226 |
| July 2025 | 29,482 |
| June 2025 | 30,456 |
| May 2025 | 31,130 |
| April 2025 | 30,523 |
| March 2025 | 25,156 |
| February 2025 | 19,022 |
| January 2025 | 16,508 |
| December 2024 | 15,242 |
| November 2024 | 18,230 |
| October 2024 | 22,989 |
| September 2024 | 27,021 |
| August 2024 | 28,278 |
| July 2024 | 28,457 |
| June 2024 | 32,211 |
| May 2024 | 33,902 |
| April 2024 | 29,898 |
| March 2024 | 20,051 |
| February 2024 | 19,584 |
| January 2024 | 16,087 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Wistaria Ranch Solar plant, and when do they retire?
1 operable generator totals 107 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 107 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| WICA | Operating | Solar Photovoltaic | 107 | 2018 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Wistaria Ranch Solar plant?
EIA lists no joint owners for Wistaria Ranch Solar. RWE Clean Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Wistaria Ranch Solar plant?
Wistaria Ranch Solar is in Calexico, Imperial County, California, at 32.6760° N, 115.6190° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Wistaria Ranch Solar's 107 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Blythe Solar 110, LLC | Riverside | 110 | 293,129 |
| Quinto Solar PV Project | Merced | 108 | 242,546 |
| Willow Spring Solar, LLC | Kern | 108 | 251,421 |
| Wistaria Ranch Solar | Imperial | 107 | 288,908 |
| Springbok Solar Farm 1 | Kern | 105 | 280,434 |
| Antelope Expansion 2 | Los Angeles | 105 | 263,751 |
| Henrietta Solar Project | Kings | 102 | 170,422 |
Source: EIA Forms EIA-860 and EIA-923, 2025.