Solar power plant, California
Antelope Expansion 2 solar power plant, California
Antelope Expansion 2 is a 105 MW solar power plant in Los Angeles County, California, operated by AES Distributed Energy, and it generated 263,751 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 85th percentile of U.S. solar plants. By 2025 generation it ranks 2,142nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Antelope Expansion 2 plant run compared with other solar plants?
The Antelope Expansion 2 plant had a capacity factor of 29% in 2025 on 105 MW of net summer capacity, the 85th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 105 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Antelope Expansion 2 | 29% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Antelope Expansion 2 plant generating more or less than last year?
Generation at Antelope Expansion 2 rose 7.2% from 2024 to 2025, from 246,117 MWh to 263,751 MWh. Through August 2026 it is running 29.3% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 246,117 |
| 2025 | 263,751 |
| 2026 through August | 142,992 |
| 2025, same months | 202,367 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 18,178 |
| July 2026 | 20,345 |
| June 2026 | 23,558 |
| May 2026 | 22,037 |
| April 2026 | 18,535 |
| March 2026 | 15,259 |
| February 2026 | 12,459 |
| January 2026 | 12,621 |
| December 2025 | 11,692 |
| November 2025 | 11,327 |
| October 2025 | 16,431 |
| September 2025 | 21,934 |
| August 2025 | 27,879 |
| July 2025 | 32,688 |
| June 2025 | 31,176 |
| May 2025 | 28,861 |
| April 2025 | 28,131 |
| March 2025 | 21,438 |
| February 2025 | 16,530 |
| January 2025 | 15,664 |
| December 2024 | 12,761 |
| November 2024 | 14,634 |
| October 2024 | 19,190 |
| September 2024 | 22,002 |
| August 2024 | 26,851 |
| July 2024 | 29,206 |
| June 2024 | 27,119 |
| May 2024 | 31,981 |
| April 2024 | 23,041 |
| March 2024 | 15,706 |
| February 2024 | 11,536 |
| January 2024 | 12,090 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Antelope Expansion 2 plant, and when do they retire?
1 operable generator totals 105 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 105 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| ANTX2 | Operating | Solar Photovoltaic | 105 | 2018 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Antelope Expansion 2 plant?
EIA lists no joint owners for Antelope Expansion 2. AES Distributed Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Antelope Expansion 2 plant?
Antelope Expansion 2 is in Lancaster, Los Angeles County, California, at 34.7450° N, 118.3092° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Antelope Expansion 2's 105 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Willow Spring Solar, LLC | Kern | 108 | 251,421 |
| Wistaria Ranch Solar | Imperial | 107 | 288,908 |
| Springbok Solar Farm 1 | Kern | 105 | 280,434 |
| Antelope Expansion 2 | Los Angeles | 105 | 263,751 |
| Henrietta Solar Project | Kings | 102 | 170,422 |
| Lockhart Solar PV, LLC | San Bernardino | 100 | 243,443 |
| RE Mustang LLC | Kings | 100 | 234,010 |
Source: EIA Forms EIA-860 and EIA-923, 2025.