Solar power plant, California

Antelope Expansion 2 solar power plant, California

Antelope Expansion 2 is a 105 MW solar power plant in Los Angeles County, California, operated by AES Distributed Energy, and it generated 263,751 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 85th percentile of U.S. solar plants. By 2025 generation it ranks 2,142nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

105 MWNameplate capacity
29%Capacity factor, 2025, 85th percentile, on 105 MW net summer
0.1%Of CA generation, 2025
7 yearsAverage generator age, by MW

How hard does the Antelope Expansion 2 plant run compared with other solar plants?

The Antelope Expansion 2 plant had a capacity factor of 29% in 2025 on 105 MW of net summer capacity, the 85th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 105 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Antelope Expansion 229%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Antelope Expansion 2 plant generating more or less than last year?

Generation at Antelope Expansion 2 rose 7.2% from 2024 to 2025, from 246,117 MWh to 263,751 MWh. Through August 2026 it is running 29.3% behind the same months of 2025.

Net generation by period
PeriodMWh
2024246,117
2025263,751
2026 through August142,992
2025, same months202,367
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202618,178
July 202620,345
June 202623,558
May 202622,037
April 202618,535
March 202615,259
February 202612,459
January 202612,621
December 202511,692
November 202511,327
October 202516,431
September 202521,934
August 202527,879
July 202532,688
June 202531,176
May 202528,861
April 202528,131
March 202521,438
February 202516,530
January 202515,664
December 202412,761
November 202414,634
October 202419,190
September 202422,002
August 202426,851
July 202429,206
June 202427,119
May 202431,981
April 202423,041
March 202415,706
February 202411,536
January 202412,090

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Antelope Expansion 2 plant?

Antelope Expansion 2 made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 260th largest of 1,877 plants in California, the 2,496th largest of 14,327 in the U.S. and the 418th largest of 7,223 solar plants. By 2025 generation it is the 202nd largest of 1,608 generating plants in the state.

Antelope Expansion 2 within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)105107,4330.1%
Generation (MWh)263,751204,542,8980.1%
Solar capacity (MW)10524,6630.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Antelope Expansion 2 plant, and when do they retire?

1 operable generator totals 105 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1105100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
ANTX2OperatingSolar Photovoltaic1052018n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Antelope Expansion 2 plant?

EIA lists no joint owners for Antelope Expansion 2. AES Distributed Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Antelope Expansion 2 plant?

Antelope Expansion 2 is in Lancaster, Los Angeles County, California, at 34.7450° N, 118.3092° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Antelope Expansion 2's 105 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Willow Spring Solar, LLCKern108251,421
Wistaria Ranch SolarImperial107288,908
Springbok Solar Farm 1Kern105280,434
Antelope Expansion 2Los Angeles105263,751
Henrietta Solar ProjectKings102170,422
Lockhart Solar PV, LLCSan Bernardino100243,443
RE Mustang LLCKings100234,010

Source: EIA Forms EIA-860 and EIA-923, 2025.