Solar power plant, California

RE Mustang LLC solar power plant, California

RE Mustang LLC is a 175 MW power plant, 100 MW of it solar, in Kings County, California, operated by MN8 Energy LLC, and it generated 220,754 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 76th percentile of U.S. solar plants. By 2025 generation it ranks 2,359th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

175 MWNameplate capacity
27%Capacity factor, 2025, solar units, 76th percentile, on 100 MW net summer
0.1%Of CA generation, 2025
7 yearsAverage generator age, by MW

How hard does the RE Mustang LLC plant run compared with other solar plants?

The RE Mustang LLC plant's solar units had a capacity factor of 27% in 2025 on 100 MW of net summer capacity, the 76th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 98 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
RE Mustang LLC27%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the RE Mustang LLC plant generating more or less than last year?

Generation at RE Mustang LLC rose 0.1% from 2024 to 2025, from 220,550 MWh to 220,754 MWh.

Net generation by period
PeriodMWh
2024220,550
2025220,754
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20252,775
November 20256,202
October 202516,612
September 202521,787
August 202527,555
July 202530,189
June 202529,000
May 202529,334
April 202522,319
March 20259,308
February 202512,915
January 202512,758
December 20247,977
November 202411,721
October 202418,190
September 202423,345
August 202427,565
July 202426,473
June 202427,391
May 202428,413
April 202421,793
March 202415,290
February 20248,294
January 20244,098

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the RE Mustang LLC plant?

RE Mustang LLC made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.2% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 149th largest of 1,877 plants in California, the 1,781st largest of 14,327 in the U.S. and the 428th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 243rd largest of 1,608 generating plants in the state.

RE Mustang LLC within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)175107,4330.2%
Generation (MWh)220,754204,542,8980.1%
Solar capacity (MW)10024,6630.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the RE Mustang LLC plant, and when do they retire?

2 operable generators total 175 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s110057%none reported
2020s17543%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PV1OperatingSolar Photovoltaic1002016n/a
BESS1OperatingBatteries752021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the RE Mustang LLC plant?

RE Mustang LLC is the only joint owner reported for RE Mustang LLC, with 100.0%. MN8 Energy LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the RE Mustang LLC plant use?

RE Mustang LLC has capacity on 2 fuels: 57% solar and 43% battery and pumped storage. In 2025, solar made 106% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar10057.1%234,010
Battery and pumped storage7542.9%-13,256

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the RE Mustang LLC plant?

RE Mustang LLC is in Lemoore, Kings County, California, at 36.2217° N, 119.9031° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and RE Mustang LLC's 100 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Antelope Expansion 2Los Angeles105263,751
Henrietta Solar ProjectKings102170,422
Lockhart Solar PV, LLCSan Bernardino100243,443
RE Mustang LLCKings100234,010
RE AstoriaKern100178,461
San Pablo RacewayLos Angeles100233,388
Drew Solar LLCImperial100308,288

Source: EIA Forms EIA-860 and EIA-923, 2025.