San Pablo Raceway is a 100 MW solar power plant in Los Angeles County, California, operated by AES Distributed Energy, and it generated 233,388 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 75th percentile of U.S. solar plants. By 2025 generation it ranks 2,306th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the San Pablo Raceway plant run compared with other solar plants?
The San Pablo Raceway plant had a capacity factor of 27% in 2025 on 100 MW of net summer capacity, the 75th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 97 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| San Pablo Raceway | 27% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the San Pablo Raceway plant generating more or less than last year?
Generation at San Pablo Raceway fell 9.1% from 2024 to 2025, from 256,668 MWh to 233,388 MWh. Through August 2026 it is running 24.2% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 256,668 |
| 2025 | 233,388 |
| 2026 through August | 128,053 |
| 2025, same months | 168,937 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 21,560 |
| July 2026 | 19,949 |
| June 2026 | 24,145 |
| May 2026 | 15,717 |
| April 2026 | 11,129 |
| March 2026 | 12,548 |
| February 2026 | 11,660 |
| January 2026 | 11,345 |
| December 2025 | 11,989 |
| November 2025 | 12,305 |
| October 2025 | 18,870 |
| September 2025 | 21,287 |
| August 2025 | 26,515 |
| July 2025 | 31,080 |
| June 2025 | 30,494 |
| May 2025 | 28,616 |
| April 2025 | 22,765 |
| March 2025 | 10,092 |
| February 2025 | 5,430 |
| January 2025 | 13,945 |
| December 2024 | 12,964 |
| November 2024 | 9,321 |
| October 2024 | 18,540 |
| September 2024 | 23,096 |
| August 2024 | 30,443 |
| July 2024 | 32,021 |
| June 2024 | 31,408 |
| May 2024 | 33,480 |
| April 2024 | 24,546 |
| March 2024 | 14,929 |
| February 2024 | 12,451 |
| January 2024 | 13,469 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the San Pablo Raceway plant, and when do they retire?
1 operable generator totals 100 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 100 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SPRWY | Operating | Solar Photovoltaic | 100 | 2019 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the San Pablo Raceway plant?
EIA lists no joint owners for San Pablo Raceway. AES Distributed Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the San Pablo Raceway plant?
San Pablo Raceway is in Lancaster, Los Angeles County, California, at 34.7237° N, 118.2803° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and San Pablo Raceway's 100 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Lockhart Solar PV, LLC | San Bernardino | 100 | 243,443 |
| RE Mustang LLC | Kings | 100 | 234,010 |
| RE Astoria | Kern | 100 | 178,461 |
| San Pablo Raceway | Los Angeles | 100 | 233,388 |
| Drew Solar LLC | Imperial | 100 | 308,288 |
| Maverick Solar 4, LLC | Riverside | 100 | 265,725 |
| Maverick Solar 6, LLC | Riverside | 100 | 265,810 |
Source: EIA Forms EIA-860 and EIA-923, 2025.