Solar power plant, California

Maverick Solar 4, LLC power plant, California

Maverick Solar 4, LLC is a 100 MW solar power plant in Riverside County, California, operated by Maverick Solar 4, LLC, and it generated 265,725 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 92nd percentile of U.S. solar plants. By 2025 generation it ranks 2,131st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

100 MWNameplate capacity
30%Capacity factor, 2025, 92nd percentile, on 100 MW net summer
0.1%Of CA generation, 2025
5 yearsAverage generator age, by MW

How hard does the Maverick Solar 4, LLC plant run compared with other solar plants?

The Maverick Solar 4, LLC plant had a capacity factor of 30% in 2025 on 100 MW of net summer capacity, the 92nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 111 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Maverick Solar 4, LLC30%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Maverick Solar 4, LLC plant generating more or less than last year?

Generation at Maverick Solar 4, LLC rose 11.9% from 2024 to 2025, from 237,511 MWh to 265,725 MWh. Through August 2026 it is running 14.4% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024237,511
2025265,725
2026 through August212,470
2025, same months185,760
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202629,416
July 202631,080
June 202633,574
May 202630,234
April 202627,419
March 202625,611
February 202618,736
January 202616,400
December 202514,648
November 202516,197
October 202524,279
September 202524,841
August 202530,570
July 202534,295
June 202532,313
May 202528,532
April 202525,026
March 202510,001
February 202510,030
January 202514,993
December 202415,097
November 202417,515
October 202421,606
September 202427,019
August 202430,379
July 202432,666
June 202432,677
May 202418,613
April 202410,259
March 20248,315
February 202411,740
January 202411,625

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Maverick Solar 4, LLC plant?

Maverick Solar 4, LLC made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. Its share of output is 1.4 times its share of capacity. By capacity it is the 272nd largest of 1,877 plants in California, the 2,602nd largest of 14,327 in the U.S. and the 456th largest of 7,223 solar plants. By 2025 generation it is the 201st largest of 1,608 generating plants in the state.

Maverick Solar 4, LLC within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)100107,4330.1%
Generation (MWh)265,725204,542,8980.1%
Solar capacity (MW)10024,6630.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Maverick Solar 4, LLC plant, and when do they retire?

1 operable generator totals 100 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1100100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
MAV02OperatingSolar Photovoltaic1002020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Maverick Solar 4, LLC plant?

EIA lists no joint owners for Maverick Solar 4, LLC. Maverick Solar 4, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Maverick Solar 4, LLC plant?

Maverick Solar 4, LLC is in Desert Center, Riverside County, California, at 33.7000° N, 115.3800° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Maverick Solar 4, LLC's 100 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
RE AstoriaKern100178,461
San Pablo RacewayLos Angeles100233,388
Drew Solar LLCImperial100308,288
Maverick Solar 4, LLCRiverside100265,725
Maverick Solar 6, LLCRiverside100265,810
Hudson - High Desert HybridSan Bernardino100298,031
Rabbitbrush Solar, LLCKern100249,029

Source: EIA Forms EIA-860 and EIA-923, 2025.