Solar power plant, California
Drew Solar LLC power plant, California
Drew Solar LLC is a 100 MW solar power plant in Imperial County, California, operated by Drew Solar LLC, and it generated 308,288 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 99th percentile of U.S. solar plants. By 2025 generation it ranks 1,939th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Drew Solar LLC plant run compared with other solar plants?
The Drew Solar LLC plant had a capacity factor of 35% in 2025 on 100 MW of net summer capacity, the 99th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 128 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Drew Solar LLC | 35% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Drew Solar LLC plant generating more or less than last year?
Generation at Drew Solar LLC fell 0.7% from 2024 to 2025, from 310,536 MWh to 308,288 MWh. Through August 2026 it is running 1.7% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 310,536 |
| 2025 | 308,288 |
| 2026 through August | 220,121 |
| 2025, same months | 223,965 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 25,748 |
| July 2026 | 30,690 |
| June 2026 | 32,232 |
| May 2026 | 34,563 |
| April 2026 | 29,059 |
| March 2026 | 29,009 |
| February 2026 | 20,909 |
| January 2026 | 17,911 |
| December 2025 | 16,708 |
| November 2025 | 17,862 |
| October 2025 | 24,593 |
| September 2025 | 25,160 |
| August 2025 | 27,194 |
| July 2025 | 33,028 |
| June 2025 | 32,648 |
| May 2025 | 33,851 |
| April 2025 | 31,929 |
| March 2025 | 26,770 |
| February 2025 | 20,433 |
| January 2025 | 18,112 |
| December 2024 | 16,414 |
| November 2024 | 19,249 |
| October 2024 | 24,615 |
| September 2024 | 29,245 |
| August 2024 | 30,706 |
| July 2024 | 32,126 |
| June 2024 | 33,073 |
| May 2024 | 33,073 |
| April 2024 | 29,603 |
| March 2024 | 24,785 |
| February 2024 | 20,858 |
| January 2024 | 16,789 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Drew Solar LLC plant, and when do they retire?
1 operable generator totals 100 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 100 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| DS | Operating | Solar Photovoltaic | 100 | 2022 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Drew Solar LLC plant?
EIA lists no joint owners for Drew Solar LLC. Drew Solar LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Drew Solar LLC plant?
Drew Solar LLC is in Calexico, Imperial County, California, at 32.6872° N, 115.6656° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Drew Solar LLC's 100 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| RE Mustang LLC | Kings | 100 | 234,010 |
| RE Astoria | Kern | 100 | 178,461 |
| San Pablo Raceway | Los Angeles | 100 | 233,388 |
| Drew Solar LLC | Imperial | 100 | 308,288 |
| Maverick Solar 4, LLC | Riverside | 100 | 265,725 |
| Maverick Solar 6, LLC | Riverside | 100 | 265,810 |
| Hudson - High Desert Hybrid | San Bernardino | 100 | 298,031 |
Source: EIA Forms EIA-860 and EIA-923, 2025.