Solar power plant, California
Hudson-High Desert Hybrid solar power plant, California
Hudson-High Desert Hybrid is a 150 MW power plant, 100 MW of it solar, in San Bernardino County, California, operated by MN8 Energy LLC, and it generated 288,956 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 99th percentile of U.S. solar plants. By 2025 generation it ranks 2,023rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Hudson-High Desert Hybrid plant run compared with other solar plants?
The Hudson-High Desert Hybrid plant's solar units had a capacity factor of 34% in 2025 on 100 MW of net summer capacity, the 99th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 124 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Hudson-High Desert Hybrid | 34% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Hudson-High Desert Hybrid plant generating more or less than last year?
Generation at Hudson-High Desert Hybrid rose 1.8% from 2024 to 2025, from 283,728 MWh to 288,956 MWh. Through August 2026 it is running 1.3% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 283,728 |
| 2025 | 288,956 |
| 2026 through August | 206,850 |
| 2025, same months | 209,540 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 27,817 |
| July 2026 | 30,586 |
| June 2026 | 32,021 |
| May 2026 | 32,443 |
| April 2026 | 25,819 |
| March 2026 | 24,244 |
| February 2026 | 17,829 |
| January 2026 | 16,091 |
| December 2025 | 14,520 |
| November 2025 | 15,455 |
| October 2025 | 23,796 |
| September 2025 | 25,645 |
| August 2025 | 30,099 |
| July 2025 | 33,667 |
| June 2025 | 35,216 |
| May 2025 | 31,124 |
| April 2025 | 27,487 |
| March 2025 | 18,446 |
| February 2025 | 16,949 |
| January 2025 | 16,552 |
| December 2024 | 12,833 |
| November 2024 | 14,844 |
| October 2024 | 21,823 |
| September 2024 | 24,039 |
| August 2024 | 31,114 |
| July 2024 | 32,044 |
| June 2024 | 33,535 |
| May 2024 | 33,344 |
| April 2024 | 24,754 |
| March 2024 | 23,877 |
| February 2024 | 16,713 |
| January 2024 | 14,808 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Hudson-High Desert Hybrid plant, and when do they retire?
2 operable generators total 150 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 150 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| BESS1 | Operating | Batteries | 50 | 2021 | n/a |
| GEN1 | Operating | Solar Photovoltaic | 100 | 2021 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Hudson-High Desert Hybrid plant?
Hdsi, LLC is the only joint owner reported for Hudson-High Desert Hybrid, with 100.0%. MN8 Energy LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Hudson-High Desert Hybrid plant use?
Hudson-High Desert Hybrid has capacity on 2 fuels: 67% solar and 33% battery and pumped storage. In 2025, solar made 103% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 100 | 66.7% | 298,031 |
| Battery and pumped storage | 50 | 33.3% | -9,075 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Hudson-High Desert Hybrid plant?
Hudson-High Desert Hybrid is in Victorville, San Bernardino County, California, at 34.6365° N, 117.3724° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Hudson-High Desert Hybrid's 100 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Drew Solar LLC | Imperial | 100 | 308,288 |
| Maverick Solar 4, LLC | Riverside | 100 | 265,725 |
| Maverick Solar 6, LLC | Riverside | 100 | 265,810 |
| Hudson - High Desert Hybrid | San Bernardino | 100 | 298,031 |
| Rabbitbrush Solar, LLC | Kern | 100 | 249,029 |
| Sandrini Solar 100 | Kern | 100 | 235,587 |
| Springbok 3 Solar Farm Hybrid | Kern | 90 | 251,125 |
Source: EIA Forms EIA-860 and EIA-923, 2025.