Skip to main content
RateWatt

Solar power plant, California

Hudson-High Desert Hybrid solar power plant, California

Hudson-High Desert Hybrid is a 150 MW power plant, 100 MW of it solar, in San Bernardino County, California, operated by MN8 Energy LLC, and it generated 288,956 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 99th percentile of U.S. solar plants. By 2025 generation it ranks 2,023rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

150 MWNameplate capacity
34%Capacity factor, 2025, solar units, 99th percentile, on 100 MW net summer
0.1%Of CA generation, 2025
4 yearsAverage generator age, by MW

How hard does the Hudson-High Desert Hybrid plant run compared with other solar plants?

The Hudson-High Desert Hybrid plant's solar units had a capacity factor of 34% in 2025 on 100 MW of net summer capacity, the 99th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 124 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Hudson-High Desert Hybrid34%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Hudson-High Desert Hybrid plant generating more or less than last year?

Generation at Hudson-High Desert Hybrid rose 1.8% from 2024 to 2025, from 283,728 MWh to 288,956 MWh. Through August 2026 it is running 1.3% behind the same months of 2025.

Net generation by period
PeriodMWh
2024283,728
2025288,956
2026 through August206,850
2025, same months209,540
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202627,817
July 202630,586
June 202632,021
May 202632,443
April 202625,819
March 202624,244
February 202617,829
January 202616,091
December 202514,520
November 202515,455
October 202523,796
September 202525,645
August 202530,099
July 202533,667
June 202535,216
May 202531,124
April 202527,487
March 202518,446
February 202516,949
January 202516,552
December 202412,833
November 202414,844
October 202421,823
September 202424,039
August 202431,114
July 202432,044
June 202433,535
May 202433,344
April 202424,754
March 202423,877
February 202416,713
January 202414,808

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Hudson-High Desert Hybrid plant?

Hudson-High Desert Hybrid made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. By capacity it is the 178th largest of 1,877 plants in California, the 1,967th largest of 14,327 in the U.S. and the 465th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 178th largest of 1,608 generating plants in the state.

Hudson-High Desert Hybrid within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)150107,4330.1%
Generation (MWh)288,956204,542,8980.1%
Solar capacity (MW)10024,6630.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Hudson-High Desert Hybrid plant, and when do they retire?

2 operable generators total 150 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2150100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BESS1OperatingBatteries502021n/a
GEN1OperatingSolar Photovoltaic1002021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Hudson-High Desert Hybrid plant?

Hdsi, LLC is the only joint owner reported for Hudson-High Desert Hybrid, with 100.0%. MN8 Energy LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Hudson-High Desert Hybrid plant use?

Hudson-High Desert Hybrid has capacity on 2 fuels: 67% solar and 33% battery and pumped storage. In 2025, solar made 103% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar10066.7%298,031
Battery and pumped storage5033.3%-9,075

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Hudson-High Desert Hybrid plant?

Hudson-High Desert Hybrid is in Victorville, San Bernardino County, California, at 34.6365° N, 117.3724° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Hudson-High Desert Hybrid's 100 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Drew Solar LLCImperial100308,288
Maverick Solar 4, LLCRiverside100265,725
Maverick Solar 6, LLCRiverside100265,810
Hudson - High Desert HybridSan Bernardino100298,031
Rabbitbrush Solar, LLCKern100249,029
Sandrini Solar 100Kern100235,587
Springbok 3 Solar Farm HybridKern90251,125

Source: EIA Forms EIA-860 and EIA-923, 2025.