Skip to main content
RateWatt

Solar power plant, California

Springbok 3 Solar Farm Hybrid power plant, California

Springbok 3 Solar Farm Hybrid is a 91.5 MW power plant, 90 MW of it solar, in Kern County, California, operated by 64KT 8me LLC, and it generated 251,125 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 96th percentile of U.S. solar plants. By 2025 generation it ranks 2,225th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

91.5 MWNameplate capacity
32%Capacity factor, 2025, solar units, 96th percentile, on 90 MW net summer
0.1%Of CA generation, 2025
6 yearsAverage generator age, by MW

How hard does the Springbok 3 Solar Farm Hybrid plant run compared with other solar plants?

The Springbok 3 Solar Farm Hybrid plant's solar units had a capacity factor of 32% in 2025 on 90 MW of net summer capacity, the 96th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 116 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Springbok 3 Solar Farm Hybrid32%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Springbok 3 Solar Farm Hybrid plant generating more or less than last year?

Generation at Springbok 3 Solar Farm Hybrid rose 1.8% from 2024 to 2025, from 246,675 MWh to 251,125 MWh. Through August 2026 it is running 14.1% behind the same months of 2025.

Net generation by period
PeriodMWh
2024246,675
2025251,125
2026 through August159,773
2025, same months185,968
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202621,959
July 202624,151
June 202622,042
May 202623,762
April 202624,660
March 202621,953
February 20269,511
January 202611,735
December 202511,274
November 202511,549
October 202520,215
September 202522,119
August 202525,600
July 202528,862
June 202528,156
May 202525,548
April 202526,836
March 202521,843
February 202515,596
January 202513,527
December 202411,814
November 202413,862
October 202418,791
September 202422,798
August 202426,098
July 202425,495
June 202426,016
May 202428,074
April 202426,249
March 202420,473
February 202414,189
January 202412,816

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Springbok 3 Solar Farm Hybrid plant?

Springbok 3 Solar Farm Hybrid made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. Its share of output is 1.4 times its share of capacity. By capacity it is the 302nd largest of 1,877 plants in California, the 2,838th largest of 14,327 in the U.S. and the 510th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 217th largest of 1,608 generating plants in the state.

Springbok 3 Solar Farm Hybrid within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)92107,4330.1%
Generation (MWh)251,125204,542,8980.1%
Solar capacity (MW)9024,6630.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Springbok 3 Solar Farm Hybrid plant, and when do they retire?

2 operable generators total 91.5 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s292100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
SB3BSOperatingBatteries22019n/a
SB3SFOperatingSolar Photovoltaic902019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Springbok 3 Solar Farm Hybrid plant?

EIA lists no joint owners for Springbok 3 Solar Farm Hybrid. 64KT 8me LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Springbok 3 Solar Farm Hybrid plant use?

Springbok 3 Solar Farm Hybrid has capacity on 2 fuels: 98% solar and 2% battery and pumped storage. In 2025, solar made 100% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar9098.4%251,125
Battery and pumped storage21.6%0

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Springbok 3 Solar Farm Hybrid plant?

Springbok 3 Solar Farm Hybrid is in Cantil, Kern County, California, at 35.1712° N, 118.0017° W. It sits in the Los Angeles Department of Water and Power balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Springbok 3 Solar Farm Hybrid's 90 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Hudson - High Desert HybridSan Bernardino100298,031
Rabbitbrush Solar, LLCKern100249,029
Sandrini Solar 100Kern100235,587
Springbok 3 Solar Farm HybridKern90251,125
Resurgence SolarSan Bernardino90266,026
Solverde 1Los Angeles85205,460
Lockhart Solar PV IISan Bernardino84207,421

Source: EIA Forms EIA-860 and EIA-923, 2025.