Solar power plant, California
Resurgence Solar power plant, California
Resurgence Solar is a 165 MW power plant, 90 MW of it solar, in San Bernardino County, California, operated by Resurgence Solar, and it generated 252,825 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 98th percentile of U.S. solar plants. By 2025 generation it ranks 2,213th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Resurgence Solar plant run compared with other solar plants?
The Resurgence Solar plant's solar units had a capacity factor of 34% in 2025 on 90 MW of net summer capacity, the 98th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 123 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Resurgence Solar | 34% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Resurgence Solar plant generating more or less than last year?
Generation at Resurgence Solar rose 8.5% from 2024 to 2025, from 232,966 MWh to 252,825 MWh. Through August 2026 it is running 6.7% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 232,966 |
| 2025 | 252,825 |
| 2026 through August | 174,893 |
| 2025, same months | 187,551 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 24,445 |
| July 2026 | 27,002 |
| June 2026 | 26,249 |
| May 2026 | 26,986 |
| April 2026 | 21,176 |
| March 2026 | 21,434 |
| February 2026 | 15,024 |
| January 2026 | 12,577 |
| December 2025 | 11,733 |
| November 2025 | 12,289 |
| October 2025 | 20,230 |
| September 2025 | 21,022 |
| August 2025 | 25,170 |
| July 2025 | 29,516 |
| June 2025 | 29,170 |
| May 2025 | 27,360 |
| April 2025 | 25,927 |
| March 2025 | 20,770 |
| February 2025 | 15,347 |
| January 2025 | 14,291 |
| December 2024 | 12,018 |
| November 2024 | 13,998 |
| October 2024 | 18,434 |
| September 2024 | 22,522 |
| August 2024 | 24,896 |
| July 2024 | 24,939 |
| June 2024 | 27,283 |
| May 2024 | 28,291 |
| April 2024 | 24,715 |
| March 2024 | 16,557 |
| February 2024 | 12,513 |
| January 2024 | 6,800 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Resurgence Solar plant, and when do they retire?
2 operable generators total 165 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 165 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN1 | Operating | Solar Photovoltaic | 90 | 2023 | n/a |
| GEN2 | Operating | Batteries | 75 | 2023 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Resurgence Solar plant?
EIA lists no joint owners for Resurgence Solar. Resurgence Solar operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Resurgence Solar plant use?
Resurgence Solar has capacity on 2 fuels: 55% solar and 45% battery and pumped storage. In 2025, solar made 105% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 90 | 54.5% | 266,026 |
| Battery and pumped storage | 75 | 45.5% | -13,201 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Resurgence Solar plant?
Resurgence Solar is in Boron, San Bernardino County, California, at 35.0066° N, 117.5448° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Resurgence Solar's 90 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Rabbitbrush Solar, LLC | Kern | 100 | 249,029 |
| Sandrini Solar 100 | Kern | 100 | 235,587 |
| Springbok 3 Solar Farm Hybrid | Kern | 90 | 251,125 |
| Resurgence Solar | San Bernardino | 90 | 266,026 |
| Solverde 1 | Los Angeles | 85 | 205,460 |
| Lockhart Solar PV II | San Bernardino | 84 | 207,421 |
| Desert Harvest, LLC | Riverside | 80 | 231,035 |
Source: EIA Forms EIA-860 and EIA-923, 2025.