Desert Harvest, LLC solar power plant, California

Desert Harvest, LLC is a 80 MW solar power plant in Riverside County, California, operated by Desert Harvest, LLC, and it generated 231,035 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 98th percentile of U.S. solar plants. By 2025 generation it ranks 2,318th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

80 MWNameplate capacity
33%Capacity factor, 2025, 98th percentile, on 80 MW net summer
0.1%Of CA generation, 2025
5 yearsAverage generator age, by MW

How hard does the Desert Harvest, LLC plant run compared with other solar plants?

The Desert Harvest, LLC plant had a capacity factor of 33% in 2025 on 80 MW of net summer capacity, the 98th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 120 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Desert Harvest, LLC33%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Desert Harvest, LLC plant generating more or less than last year?

Generation at Desert Harvest, LLC rose 17.1% from 2024 to 2025, from 197,224 MWh to 231,035 MWh. Through August 2026 it is running 1.4% behind the same months of 2025.

Net generation by period
PeriodMWh
2024197,224
2025231,035
2026 through August166,798
2025, same months169,136
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202622,059
July 202622,658
June 202625,698
May 202626,416
April 202622,735
March 202620,517
February 202614,254
January 202612,461
December 202510,767
November 202512,792
October 202518,960
September 202519,380
August 202523,726
July 202526,775
June 202526,159
May 202525,520
April 202523,406
March 202516,592
February 202513,600
January 202513,358
December 202412,372
November 202413,871
October 202416,985
September 202421,338
August 202422,858
July 202423,525
June 202422,768
May 202417,507
April 202413,019
March 202411,038
February 202411,652
January 202410,291

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Desert Harvest, LLC plant?

Desert Harvest, LLC made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. Its share of output is 1.5 times its share of capacity. By capacity it is the 321st largest of 1,877 plants in California, the 2,965th largest of 14,327 in the U.S. and the 536th largest of 7,223 solar plants. By 2025 generation it is the 239th largest of 1,608 generating plants in the state.

Desert Harvest, LLC within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)80107,4330.1%
Generation (MWh)231,035204,542,8980.1%
Solar capacity (MW)8024,6630.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Desert Harvest, LLC plant, and when do they retire?

1 operable generator totals 80 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s180100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
DH001OperatingSolar Photovoltaic802020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Desert Harvest, LLC plant?

EIA lists no joint owners for Desert Harvest, LLC. Desert Harvest, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Desert Harvest, LLC plant?

Desert Harvest, LLC is in Desert Center, Riverside County, California, at 33.8000° N, 115.3800° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Desert Harvest, LLC's 80 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Resurgence SolarSan Bernardino90266,026
Solverde 1Los Angeles85205,460
Lockhart Solar PV IISan Bernardino84207,421
Desert Harvest, LLCRiverside80231,035
RE Astoria 2Kern75144,825
Colgreen North Shore Solar FarmRiverside75117,832
Titan Solar 1 (CA)Imperial70130,368