Skip to main content
RateWatt

Solar power plant, California

Titan Solar 1 power plant, California

Titan Solar 1 (CA) is a 70 MW solar power plant in Imperial County, California, operated by Titan Solar 1, LLC, and it generated 130,368 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 35th percentile of U.S. solar plants. By 2025 generation it ranks 3,102nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

70 MWNameplate capacity
21%Capacity factor, 2025, 35th percentile, on 70 MW net summer
0.1%Of CA generation, 2025
5 yearsAverage generator age, by MW

How hard does the Titan Solar 1 (CA) plant run compared with other solar plants?

The Titan Solar 1 (CA) plant had a capacity factor of 21% in 2025 on 70 MW of net summer capacity, the 35th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 78 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Titan Solar 1 (CA)21%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Titan Solar 1 (CA) plant generating more or less than last year?

Generation at Titan Solar 1 (CA) fell 10.3% from 2024 to 2025, from 145,275 MWh to 130,368 MWh. Through August 2026 it is running 38.9% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024145,275
2025130,368
2026 through August120,454
2025, same months86,745
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202618,939
July 202620,702
June 202620,794
May 202617,330
April 202612,178
March 202610,848
February 20269,928
January 20269,735
December 20258,244
November 20259,407
October 202512,993
September 202512,979
August 202512,025
July 20253,460
June 202512,245
May 202518,177
April 202514,081
March 20259,137
February 20257,242
January 202510,378
December 20249,794
November 20247,772
October 202414,639
September 202416,792
August 202418,765
July 202421,407
June 202420,324
May 202410,964
April 20244,691
March 20244,876
February 20246,698
January 20248,553

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Titan Solar 1 (CA) plant?

Titan Solar 1 (CA) made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. By capacity it is the 349th largest of 1,877 plants in California, the 3,346th largest of 14,327 in the U.S. and the 769th largest of 7,223 solar plants. By 2025 generation it is the 317th largest of 1,608 generating plants in the state.

Titan Solar 1 (CA) within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)70107,4330.1%
Generation (MWh)130,368204,542,8980.1%
Solar capacity (MW)7024,6630.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Titan Solar 1 (CA) plant, and when do they retire?

1 operable generator totals 70 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s170100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
TITN1OperatingSolar Photovoltaic702020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Titan Solar 1 (CA) plant?

EIA lists no joint owners for Titan Solar 1 (CA). Titan Solar 1, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Titan Solar 1 (CA) plant?

Titan Solar 1 (CA) is in Borrego Springs, Imperial County, California, at 33.1258° N, 115.9111° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Titan Solar 1 (CA)'s 70 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Desert Harvest, LLCRiverside80231,035
RE Astoria 2Kern75144,825
Colgreen North Shore Solar FarmRiverside75117,832
Titan Solar 1 (CA)Imperial70130,368
Desert Harvest II LLCRiverside70183,786
Edwards Sanborn E5Kern68155,383
Alpine SolarLos Angeles66114,054

Source: EIA Forms EIA-860 and EIA-923, 2025.