Skip to main content
RateWatt

Solar power plant, California

RE Astoria 2 solar power plant, California

RE Astoria 2 is a 75 MW solar power plant in Kern County, California, operated by RE Astoria 2 LLC, and it generated 144,825 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 41st percentile of U.S. solar plants. By 2025 generation it ranks 2,954th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

75 MWNameplate capacity
22%Capacity factor, 2025, 41st percentile, on 75 MW net summer
0.1%Of CA generation, 2025
9 yearsAverage generator age, by MW

How hard does the RE Astoria 2 plant run compared with other solar plants?

The RE Astoria 2 plant had a capacity factor of 22% in 2025 on 75 MW of net summer capacity, the 41st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 80 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
RE Astoria 222%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the RE Astoria 2 plant generating more or less than last year?

Generation at RE Astoria 2 fell 7.2% from 2024 to 2025, from 156,005 MWh to 144,825 MWh. Through August 2026 it is running 44.1% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024156,005
2025144,825
2026 through August146,515
2025, same months101,670
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202620,285
July 202621,860
June 202623,817
May 202623,255
April 202620,371
March 202618,100
February 202610,606
January 20268,221
December 20257,134
November 20257,832
October 202512,893
September 202515,296
August 202518,525
July 202519,657
June 202515,330
May 202513,565
April 20259,696
March 20259,597
February 20257,102
January 20258,198
December 20247,499
November 20248,549
October 202411,761
September 202415,903
August 202421,079
July 202421,246
June 202422,080
May 202414,931
April 20248,322
March 20246,372
February 20248,687
January 20249,576

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the RE Astoria 2 plant?

RE Astoria 2 made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. By capacity it is the 335th largest of 1,877 plants in California, the 3,097th largest of 14,327 in the U.S. and the 580th largest of 7,223 solar plants. By 2025 generation it is the 299th largest of 1,608 generating plants in the state.

RE Astoria 2 within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)75107,4330.1%
Generation (MWh)144,825204,542,8980.1%
Solar capacity (MW)7524,6630.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the RE Astoria 2 plant, and when do they retire?

1 operable generator totals 75 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
ASTR2OperatingSolar Photovoltaic752016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the RE Astoria 2 plant?

EIA lists no joint owners for RE Astoria 2. RE Astoria 2 LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the RE Astoria 2 plant?

RE Astoria 2 is in Rosamond, Kern County, California, at 34.8366° N, 118.4802° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and RE Astoria 2's 75 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Solverde 1Los Angeles85205,460
Lockhart Solar PV IISan Bernardino84207,421
Desert Harvest, LLCRiverside80231,035
RE Astoria 2Kern75144,825
Colgreen North Shore Solar FarmRiverside75117,832
Titan Solar 1 (CA)Imperial70130,368
Desert Harvest II LLCRiverside70183,786

Source: EIA Forms EIA-860 and EIA-923, 2025.