Solar power plant, California
Solverde 1 solar power plant, California
Solverde 1 is a 85 MW solar power plant in Los Angeles County, California, operated by AES Distributed Energy, and it generated 205,460 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 87th percentile of U.S. solar plants. By 2025 generation it ranks 2,456th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Solverde 1 plant run compared with other solar plants?
The Solverde 1 plant had a capacity factor of 29% in 2025 on 81 MW of net summer capacity, the 87th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 106 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Solverde 1 | 29% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Solverde 1 plant generating more or less than last year?
Generation at Solverde 1 rose 6.4% from 2024 to 2025, from 193,156 MWh to 205,460 MWh. Through August 2026 it is running 6.7% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 193,156 |
| 2025 | 205,460 |
| 2026 through August | 146,395 |
| 2025, same months | 156,895 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 17,759 |
| July 2026 | 21,024 |
| June 2026 | 22,776 |
| May 2026 | 24,888 |
| April 2026 | 21,178 |
| March 2026 | 18,001 |
| February 2026 | 11,369 |
| January 2026 | 9,400 |
| December 2025 | 8,622 |
| November 2025 | 8,817 |
| October 2025 | 14,522 |
| September 2025 | 16,604 |
| August 2025 | 20,218 |
| July 2025 | 25,418 |
| June 2025 | 23,863 |
| May 2025 | 23,335 |
| April 2025 | 22,177 |
| March 2025 | 17,587 |
| February 2025 | 12,655 |
| January 2025 | 11,642 |
| December 2024 | 9,788 |
| November 2024 | 11,008 |
| October 2024 | 14,382 |
| September 2024 | 17,897 |
| August 2024 | 21,635 |
| July 2024 | 20,793 |
| June 2024 | 23,157 |
| May 2024 | 23,028 |
| April 2024 | 17,815 |
| March 2024 | 13,953 |
| February 2024 | 9,937 |
| January 2024 | 9,763 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Solverde 1 plant, and when do they retire?
1 operable generator totals 85 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 85 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SOLV1 | Operating | Solar Photovoltaic | 85 | 2016 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Solverde 1 plant?
EIA lists no joint owners for Solverde 1. AES Distributed Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Solverde 1 plant?
Solverde 1 is in Lancaster, Los Angeles County, California, at 34.6557° N, 118.2982° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Solverde 1's 85 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Sandrini Solar 100 | Kern | 100 | 235,587 |
| Springbok 3 Solar Farm Hybrid | Kern | 90 | 251,125 |
| Resurgence Solar | San Bernardino | 90 | 266,026 |
| Solverde 1 | Los Angeles | 85 | 205,460 |
| Lockhart Solar PV II | San Bernardino | 84 | 207,421 |
| Desert Harvest, LLC | Riverside | 80 | 231,035 |
| RE Astoria 2 | Kern | 75 | 144,825 |
Source: EIA Forms EIA-860 and EIA-923, 2025.