Solar power plant, California

Sandrini Solar 100 power plant, California

Sandrini Solar 100 is a 195 MW power plant, 100 MW of it solar, in Kern County, California, operated by EDPR CA Solar Park II LLC, and it generated 235,587 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 77th percentile of U.S. solar plants. By 2025 generation it ranks 2,294th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

195 MWNameplate capacity
27%Capacity factor, 2025, solar units, 77th percentile, on 100 MW net summer
0.1%Of CA generation, 2025
1 yearAverage generator age, by MW

How hard does the Sandrini Solar 100 plant run compared with other solar plants?

The Sandrini Solar 100 plant's solar units had a capacity factor of 27% in 2025 on 100 MW of net summer capacity, the 77th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 98 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Sandrini Solar 10027%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Sandrini Solar 100 plant generating more or less than last year?

Sandrini Solar 100 generated 235,587 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 6.2% ahead of the same months of 2025. 2024 has output for only 1 month, so the two years are not compared.

Net generation by period
PeriodMWh
202411,496
2025235,587
2026 through August192,397
2025, same months181,208
Monthly generation, Dec 2024 to Aug 2026
MonthMWh
August 202627,229
July 202631,293
June 202627,499
May 202629,457
April 202624,531
March 202625,151
February 202615,783
January 202611,454
December 20256,092
November 20250
October 202523,286
September 202525,001
August 202528,713
July 202533,090
June 202531,464
May 202532,360
March 202522,909
February 202516,442
January 202516,230
December 202411,496

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Sandrini Solar 100 plant?

Sandrini Solar 100 made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.2% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 138th largest of 1,877 plants in California, the 1,675th largest of 14,327 in the U.S. and the 472nd largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 232nd largest of 1,608 generating plants in the state.

Sandrini Solar 100 within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)195107,4330.2%
Generation (MWh)235,587204,542,8980.1%
Solar capacity (MW)10024,6630.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Sandrini Solar 100 plant, and when do they retire?

2 operable generators total 195 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2195100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN02OperatingSolar Photovoltaic1002024n/a
GENBAOperatingBatteries952025n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Sandrini Solar 100 plant?

EIA lists no joint owners for Sandrini Solar 100. EDPR CA Solar Park II LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Sandrini Solar 100 plant use?

Sandrini Solar 100 has capacity on 2 fuels: 51% solar and 49% battery and pumped storage. In 2025, solar made 100% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar10051.2%235,587
Battery and pumped storage9548.8%0

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Sandrini Solar 100 plant?

Sandrini Solar 100 is in Mettler, Kern County, California, at 35.1132° N, 119.1105° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Sandrini Solar 100's 100 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Maverick Solar 6, LLCRiverside100265,810
Hudson - High Desert HybridSan Bernardino100298,031
Rabbitbrush Solar, LLCKern100249,029
Sandrini Solar 100Kern100235,587
Springbok 3 Solar Farm HybridKern90251,125
Resurgence SolarSan Bernardino90266,026
Solverde 1Los Angeles85205,460

Source: EIA Forms EIA-860 and EIA-923, 2025.