Solar power plant, California
Sandrini Solar 100 power plant, California
Sandrini Solar 100 is a 195 MW power plant, 100 MW of it solar, in Kern County, California, operated by EDPR CA Solar Park II LLC, and it generated 235,587 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 77th percentile of U.S. solar plants. By 2025 generation it ranks 2,294th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Sandrini Solar 100 plant run compared with other solar plants?
The Sandrini Solar 100 plant's solar units had a capacity factor of 27% in 2025 on 100 MW of net summer capacity, the 77th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 98 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Sandrini Solar 100 | 27% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Sandrini Solar 100 plant generating more or less than last year?
Sandrini Solar 100 generated 235,587 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 6.2% ahead of the same months of 2025. 2024 has output for only 1 month, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 11,496 |
| 2025 | 235,587 |
| 2026 through August | 192,397 |
| 2025, same months | 181,208 |
Monthly generation, Dec 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 27,229 |
| July 2026 | 31,293 |
| June 2026 | 27,499 |
| May 2026 | 29,457 |
| April 2026 | 24,531 |
| March 2026 | 25,151 |
| February 2026 | 15,783 |
| January 2026 | 11,454 |
| December 2025 | 6,092 |
| November 2025 | 0 |
| October 2025 | 23,286 |
| September 2025 | 25,001 |
| August 2025 | 28,713 |
| July 2025 | 33,090 |
| June 2025 | 31,464 |
| May 2025 | 32,360 |
| March 2025 | 22,909 |
| February 2025 | 16,442 |
| January 2025 | 16,230 |
| December 2024 | 11,496 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Sandrini Solar 100 plant, and when do they retire?
2 operable generators total 195 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 195 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN02 | Operating | Solar Photovoltaic | 100 | 2024 | n/a |
| GENBA | Operating | Batteries | 95 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Sandrini Solar 100 plant?
EIA lists no joint owners for Sandrini Solar 100. EDPR CA Solar Park II LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Sandrini Solar 100 plant use?
Sandrini Solar 100 has capacity on 2 fuels: 51% solar and 49% battery and pumped storage. In 2025, solar made 100% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 100 | 51.2% | 235,587 |
| Battery and pumped storage | 95 | 48.8% | 0 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Sandrini Solar 100 plant?
Sandrini Solar 100 is in Mettler, Kern County, California, at 35.1132° N, 119.1105° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Sandrini Solar 100's 100 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Maverick Solar 6, LLC | Riverside | 100 | 265,810 |
| Hudson - High Desert Hybrid | San Bernardino | 100 | 298,031 |
| Rabbitbrush Solar, LLC | Kern | 100 | 249,029 |
| Sandrini Solar 100 | Kern | 100 | 235,587 |
| Springbok 3 Solar Farm Hybrid | Kern | 90 | 251,125 |
| Resurgence Solar | San Bernardino | 90 | 266,026 |
| Solverde 1 | Los Angeles | 85 | 205,460 |
Source: EIA Forms EIA-860 and EIA-923, 2025.