Desert Harvest II LLC solar power plant, California

Desert Harvest II LLC is a 105 MW power plant, 70 MW of it solar, in Riverside County, California, operated by Desert Harvest II LLC, and it generated 180,613 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 90th percentile of U.S. solar plants. By 2025 generation it ranks 2,642nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

105 MWNameplate capacity
30%Capacity factor, 2025, solar units, 90th percentile, on 70 MW net summer
0.1%Of CA generation, 2025
5 yearsAverage generator age, by MW

How hard does the Desert Harvest II LLC plant run compared with other solar plants?

The Desert Harvest II LLC plant's solar units had a capacity factor of 30% in 2025 on 70 MW of net summer capacity, the 90th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 109 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Desert Harvest II LLC30%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Desert Harvest II LLC plant generating more or less than last year?

Generation at Desert Harvest II LLC rose 15.4% from 2024 to 2025, from 156,505 MWh to 180,613 MWh. Through August 2026 it is running 9.4% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024156,505
2025180,613
2026 through August140,894
2025, same months128,764
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202618,548
July 202622,157
June 202622,290
May 202620,484
April 202618,574
March 202616,252
February 202612,130
January 202610,459
December 20259,424
November 202510,783
October 202516,238
September 202515,404
August 202519,126
July 202522,149
June 202522,611
May 202520,965
April 202516,506
March 20257,041
February 20259,502
January 202510,864
December 202410,249
November 202411,828
October 202414,729
September 202416,883
August 202419,169
July 202419,396
June 202420,328
May 202418,030
April 20248,382
March 20244,889
February 20246,359
January 20246,263

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Desert Harvest II LLC plant?

Desert Harvest II LLC made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. By capacity it is the 260th largest of 1,877 plants in California, the 2,496th largest of 14,327 in the U.S. and the 770th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 269th largest of 1,608 generating plants in the state.

Desert Harvest II LLC within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)105107,4330.1%
Generation (MWh)180,613204,542,8980.1%
Solar capacity (MW)7024,6630.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Desert Harvest II LLC plant, and when do they retire?

2 operable generators total 105 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2105100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
DH002OperatingSolar Photovoltaic702020n/a
DH003OperatingBatteries352021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Desert Harvest II LLC plant?

EIA lists no joint owners for Desert Harvest II LLC. Desert Harvest II LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Desert Harvest II LLC plant use?

Desert Harvest II LLC has capacity on 2 fuels: 67% solar and 33% battery and pumped storage. In 2025, solar made 102% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar7066.7%183,786
Battery and pumped storage3533.3%-3,173

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Desert Harvest II LLC plant?

Desert Harvest II LLC is in Desert Center, Riverside County, California, at 33.8000° N, 115.3800° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Desert Harvest II LLC's 70 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
RE Astoria 2Kern75144,825
Colgreen North Shore Solar FarmRiverside75117,832
Titan Solar 1 (CA)Imperial70130,368
Desert Harvest II LLCRiverside70183,786
Edwards Sanborn E5Kern68155,383
Alpine SolarLos Angeles66114,054
North Star SolarFresno62133,232

Source: EIA Forms EIA-860 and EIA-923, 2025.