Solar power plant, California

Edwards Sanborn E5 solar power plant, California

Edwards Sanborn E5 is a 115 MW power plant, 68 MW of it solar, in Kern County, California, operated by Terra-Gen Operating Co-Hybrid, and it generated 155,383 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 72nd percentile of U.S. solar plants. By 2025 generation it ranks 2,848th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

115 MWNameplate capacity
26%Capacity factor, 2025, solar units, 72nd percentile, on 68 MW net summer
0.1%Of CA generation, 2025
3 yearsAverage generator age, by MW

How hard does the Edwards Sanborn E5 plant run compared with other solar plants?

The Edwards Sanborn E5 plant's solar units had a capacity factor of 26% in 2025 on 68 MW of net summer capacity, the 72nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 95 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Edwards Sanborn E526%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Edwards Sanborn E5 plant generating more or less than last year?

Generation at Edwards Sanborn E5 rose 17.6% from 2024 to 2025, from 132,099 MWh to 155,383 MWh. Through August 2026 it is running 3.5% behind the same months of 2025.

Net generation by period
PeriodMWh
2024132,099
2025155,383
2026 through August110,877
2025, same months114,903
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202616,142
July 202616,478
June 202618,358
May 202617,221
April 202613,285
March 202613,031
February 20268,569
January 20267,793
December 20257,139
November 20257,347
October 202512,371
September 202513,623
August 202516,541
July 202518,291
June 202517,803
May 202517,173
April 202515,889
March 202511,936
February 20258,784
January 20258,486
December 20247,074
November 20247,759
October 202411,791
September 202413,493
August 20245,254
July 20248,152
June 202416,798
May 202418,251
April 202415,410
March 202412,319
February 20248,330
January 20247,468

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Edwards Sanborn E5 plant?

Edwards Sanborn E5 made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 243rd largest of 1,877 plants in California, the 2,386th largest of 14,327 in the U.S. and the 783rd largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 288th largest of 1,608 generating plants in the state.

Edwards Sanborn E5 within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)115107,4330.1%
Generation (MWh)155,383204,542,8980.1%
Solar capacity (MW)6824,6630.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Edwards Sanborn E5 plant, and when do they retire?

2 operable generators total 115 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2115100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PVOperatingSolar Photovoltaic682022n/a
BESSOperatingBatteries472023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Edwards Sanborn E5 plant?

EdSan 1B Group 1 Sanborn, LLC is the only joint owner reported for Edwards Sanborn E5, with 100.0%. Terra-Gen Operating Co-Hybrid operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Edwards Sanborn E5 plant use?

Edwards Sanborn E5 has capacity on 2 fuels: 59% solar and 41% battery and pumped storage. In 2025, solar made 100% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar6859.1%155,383
Battery and pumped storage4740.9%0

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Edwards Sanborn E5 plant?

Edwards Sanborn E5 is in Mojave, Kern County, California, at 34.9653° N, 118.0773° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Edwards Sanborn E5's 68 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Colgreen North Shore Solar FarmRiverside75117,832
Titan Solar 1 (CA)Imperial70130,368
Desert Harvest II LLCRiverside70183,786
Edwards Sanborn E5Kern68155,383
Alpine SolarLos Angeles66114,054
North Star SolarFresno62133,232
Regulus Solar ProjectKern60149,746

Source: EIA Forms EIA-860 and EIA-923, 2025.