Solar power plant, California
Springbok Solar Farm 1 power plant, California
Springbok Solar Farm 1 is a 105 MW solar power plant in Kern County, California, operated by 62SK 8me, LLC, and it generated 280,434 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 93rd percentile of U.S. solar plants. By 2025 generation it ranks 2,058th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Springbok Solar Farm 1 plant run compared with other solar plants?
The Springbok Solar Farm 1 plant had a capacity factor of 30% in 2025 on 105 MW of net summer capacity, the 93rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 111 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Springbok Solar Farm 1 | 30% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Springbok Solar Farm 1 plant generating more or less than last year?
Generation at Springbok Solar Farm 1 fell 5.8% from 2024 to 2025, from 297,692 MWh to 280,434 MWh.
| Period | MWh |
|---|---|
| 2024 | 297,692 |
| 2025 | 280,434 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 12,703 |
| November 2025 | 12,758 |
| October 2025 | 21,514 |
| September 2025 | 23,363 |
| August 2025 | 27,248 |
| July 2025 | 31,848 |
| June 2025 | 33,184 |
| May 2025 | 32,499 |
| April 2025 | 29,321 |
| March 2025 | 24,649 |
| February 2025 | 15,547 |
| January 2025 | 15,800 |
| December 2024 | 13,668 |
| November 2024 | 16,660 |
| October 2024 | 22,586 |
| September 2024 | 26,741 |
| August 2024 | 32,024 |
| July 2024 | 31,250 |
| June 2024 | 33,634 |
| May 2024 | 34,877 |
| April 2024 | 30,606 |
| March 2024 | 23,719 |
| February 2024 | 16,919 |
| January 2024 | 15,008 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Springbok Solar Farm 1 plant, and when do they retire?
1 operable generator totals 105 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 105 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SB1 | Operating | Solar Photovoltaic | 105 | 2016 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Springbok Solar Farm 1 plant?
EIA lists no joint owners for Springbok Solar Farm 1. 62SK 8me, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Springbok Solar Farm 1 plant?
Springbok Solar Farm 1 is in Cantil, Kern County, California, at 35.2492° N, 117.9553° W. It sits in the Los Angeles Department of Water and Power balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Springbok Solar Farm 1's 105 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Quinto Solar PV Project | Merced | 108 | 242,546 |
| Willow Spring Solar, LLC | Kern | 108 | 251,421 |
| Wistaria Ranch Solar | Imperial | 107 | 288,908 |
| Springbok Solar Farm 1 | Kern | 105 | 280,434 |
| Antelope Expansion 2 | Los Angeles | 105 | 263,751 |
| Henrietta Solar Project | Kings | 102 | 170,422 |
| Lockhart Solar PV, LLC | San Bernardino | 100 | 243,443 |
Source: EIA Forms EIA-860 and EIA-923, 2025.