Cedar Point Wind is a 252 MW wind power plant in Lincoln County, Colorado, operated by Cedar Point LLC, and it generated 692,569 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.2% of the generation reported in Colorado, and its capacity factor sits at the 45th percentile of U.S. wind plants. By 2025 generation it ranks 1,001st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

252 MWNameplate capacity
31%Capacity factor, 2025, 45th percentile, on 252 MW net summer
1.2%Of CO generation, 2025
14 yearsAverage generator age, by MW

How hard does the Cedar Point Wind plant run compared with other wind plants?

The Cedar Point Wind plant had a capacity factor of 31% in 2025 on 252 MW of net summer capacity, the 45th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 115 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Cedar Point Wind31%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Cedar Point Wind plant generating more or less than last year?

Generation at Cedar Point Wind rose 3.3% from 2024 to 2025, from 670,507 MWh to 692,569 MWh. Through August 2026 it is running 8.8% behind the same months of 2025.

Net generation by period
PeriodMWh
2024670,507
2025692,569
2026 through August411,438
2025, same months450,893
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202644,879
July 202654,095
June 202659,828
May 202646,276
April 202641,443
March 202661,001
February 202649,717
January 202654,199
December 202568,463
November 202555,364
October 202572,336
September 202545,513
August 202558,998
July 202566,669
June 202559,050
May 202550,412
April 202546,267
March 202569,120
February 202551,522
January 202548,855
December 202455,472
November 202457,153
October 202462,145
September 202462,874
August 202462,359
July 202449,573
June 202456,523
May 202454,661
April 202453,754
March 202457,243
February 202449,324
January 202449,426

Source: EIA Form EIA-923, through August 2026.

How much of Colorado's electricity comes from the Cedar Point Wind plant?

Cedar Point Wind made 1.2% of the 55,830,894 MWh reported by Colorado plants in 2025, from 1.1% of the state's 22,712 MW of capacity. By capacity it is the 25th largest of 321 plants in Colorado, the 1,228th largest of 14,327 in the U.S. and the 134th largest of 1,358 wind plants. By 2025 generation it is the 19th largest of 292 generating plants in the state.

Cedar Point Wind within Colorado, 2025
MeasureThis plantColoradoShare
Capacity (MW)25222,7121.1%
Generation (MWh)692,56955,830,8941.2%
Wind capacity (MW)2525,3494.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Cedar Point Wind plant, and when do they retire?

1 operable generator totals 252 MW, with an average age of 14 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1252100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1-139OperatingOnshore Wind Turbine2522011n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Cedar Point Wind plant?

2 owners report shares in Cedar Point Wind; Cedar Point LLC holds the largest named share, 51.0% or about 129 MW. Cedar Point LLC operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
Cedar Point LLC51.0%129353,210
Clover US Blocker LLC49.0%123339,359

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

Where is the Cedar Point Wind plant?

Cedar Point Wind is in Limon, Lincoln County, Colorado, at 39.4218° N, 103.6781° W. It sits in the Public Service Company of Colorado balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Colorado are similar in size?

Colorado has 33 operable wind plants with 5,349 MW of capacity, and Cedar Point Wind's 252 MW is 5% of that.

Wind plants in Colorado around this size
PlantCountyMW2025 MWh
Cheyenne Ridge Wind FarmCheyenne4981,638,498
Cedar Creek WindWeld301688,682
Bronco Plains Wind, LLCKit Carson3001,087,885
Cedar Point WindLincoln252692,569
Golden West Power Partners LLCEl Paso250798,203
Cedar Creek IIWeld248606,928
Niyol Wind, LLCLogan206794,979