Wind power plant, Colorado

Golden West Power Partners LLC wind power plant, Colorado

Golden West Power Partners LLC is a 250 MW wind power plant in El Paso County, Colorado, operated by Golden West Power Partners, LLC, and it generated 798,203 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.4% of the generation reported in Colorado, and its capacity factor sits at the 61st percentile of U.S. wind plants. By 2025 generation it ranks 881st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

250 MWNameplate capacity
36%Capacity factor, 2025, 61st percentile, on 250 MW net summer
1.4%Of CO generation, 2025
10 yearsAverage generator age, by MW

How hard does the Golden West Power Partners LLC plant run compared with other wind plants?

The Golden West Power Partners LLC plant had a capacity factor of 36% in 2025 on 250 MW of net summer capacity, the 61st percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 133 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Golden West Power Partners LLC36%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Golden West Power Partners LLC plant generating more or less than last year?

Generation at Golden West Power Partners LLC fell 6.8% from 2024 to 2025, from 856,642 MWh to 798,203 MWh. Through August 2026 it is running 6.8% behind the same months of 2025.

Net generation by period
PeriodMWh
2024856,642
2025798,203
2026 through August489,810
2025, same months525,437
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202645,334
July 202662,331
June 202660,080
May 202650,004
April 202651,812
March 202680,763
February 202665,359
January 202674,127
December 202573,671
November 202566,840
October 202575,756
September 202556,499
August 202561,220
July 202564,738
June 202565,624
May 202567,236
April 202573,697
March 202561,234
February 202567,699
January 202563,989
December 202464,482
November 202474,106
October 202484,813
September 202469,512
August 202466,044
July 202456,169
June 202471,666
May 202485,883
April 202477,886
March 202481,201
February 202468,901
January 202455,979

Source: EIA Form EIA-923, through August 2026.

How much of Colorado's electricity comes from the Golden West Power Partners LLC plant?

Golden West Power Partners LLC made 1.4% of the 55,830,894 MWh reported by Colorado plants in 2025, from 1.1% of the state's 22,712 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 26th largest of 321 plants in Colorado, the 1,239th largest of 14,327 in the U.S. and the 141st largest of 1,358 wind plants. By 2025 generation it is the 15th largest of 292 generating plants in the state.

Golden West Power Partners LLC within Colorado, 2025
MeasureThis plantColoradoShare
Capacity (MW)25022,7121.1%
Generation (MWh)798,20355,830,8941.4%
Wind capacity (MW)2505,3494.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Golden West Power Partners LLC plant, and when do they retire?

1 operable generator totals 250 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1250100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GW1OperatingOnshore Wind Turbine2502015n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Golden West Power Partners LLC plant?

EIA lists no joint owners for Golden West Power Partners LLC. Golden West Power Partners, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Golden West Power Partners LLC plant?

Golden West Power Partners LLC is in Calhan, El Paso County, Colorado, at 38.9350° N, 104.2120° W. It sits in the Public Service Company of Colorado balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Colorado are similar in size?

Colorado has 33 operable wind plants with 5,349 MW of capacity, and Golden West Power Partners LLC's 250 MW is 5% of that.

Wind plants in Colorado around this size
PlantCountyMW2025 MWh
Cedar Creek WindWeld301688,682
Bronco Plains Wind, LLCKit Carson3001,087,885
Cedar Point WindLincoln252692,569
Golden West Power Partners LLCEl Paso250798,203
Cedar Creek IIWeld248606,928
Niyol Wind, LLCLogan206794,979
Logan Wind EnergyLogan201557,021