Cedar Trail is a 74.5 MW solar power plant in Baker County, Florida, operated by Florida Power & Light Co, and it generated 178,300 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 79th percentile of U.S. solar plants. By 2025 generation it ranks 2,664th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
27%Capacity factor, 2025, 79th percentile, on 74.5 MW net summer
0.1%Of FL generation, 2025
1 yearAverage generator age, by MW

How hard does the Cedar Trail plant run compared with other solar plants?

The Cedar Trail plant had a capacity factor of 27% in 2025 on 74.5 MW of net summer capacity, the 79th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 100 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Cedar Trail27%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Cedar Trail plant generating more or less than last year?

Cedar Trail generated 178,300 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 10.5% behind the same months of 2025. 2024 has output for only 2 months, so the two years are not compared.

Net generation by period
PeriodMWh
202416,596
2025178,300
2026 through August114,656
2025, same months128,057
Monthly generation, Nov 2024 to Aug 2026
MonthMWh
August 202615,621
July 202618,152
June 202616,258
May 202615,114
April 202616,670
March 202611,434
February 202611,471
January 20269,936
December 20258,862
November 202512,700
October 202513,214
September 202515,467
August 202514,999
July 202517,803
June 202516,811
May 202519,234
April 202520,025
March 202516,997
February 202511,378
January 202510,810
December 20249,514
November 20247,082

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Cedar Trail plant?

Cedar Trail made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 746th largest of 7,223 solar plants. By 2025 generation it is the 101st largest of 313 generating plants in the state.

Cedar Trail within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)178,300267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Cedar Trail plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic752024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Cedar Trail plant?

EIA lists no joint owners for Cedar Trail. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of Cedar Trail, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Cedar Trail plant?

Cedar Trail is in Glen St Mary, Baker County, Florida, at 30.3391° N, 82.1929° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Cedar Trail's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Gilchrist County SolarAlachua75199,909
Harmony Florida Solar IIOsceola75184,165
Storey Bend SolarOsceola75184,346
Cedar TrailBaker75178,300
SwallowtailWalton75169,709
Bronson SolarLevy7565,863
Cottonmouth Ranch SolarHillsborough755,205