Solar power plant, Florida
Storey Bend Solar power plant, Florida
Storey Bend Solar is a 74.5 MW solar power plant in Osceola County, Florida, operated by Storey Bend Solar, LLC, and it generated 184,346 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 84th percentile of U.S. solar plants. By 2025 generation it ranks 2,605th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Storey Bend Solar plant run compared with other solar plants?
The Storey Bend Solar plant had a capacity factor of 28% in 2025 on 74.5 MW of net summer capacity, the 84th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 103 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Storey Bend Solar | 28% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Storey Bend Solar plant generating more or less than last year?
Storey Bend Solar generated 184,346 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 0.4% ahead of the same months of 2025. 2024 has output for only 1 month, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 12,451 |
| 2025 | 184,346 |
| 2026 through August | 132,864 |
| 2025, same months | 132,281 |
Monthly generation, Dec 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 16,582 |
| July 2026 | 18,669 |
| June 2026 | 18,144 |
| May 2026 | 18,453 |
| April 2026 | 17,610 |
| March 2026 | 16,299 |
| February 2026 | 14,638 |
| January 2026 | 12,469 |
| December 2025 | 10,984 |
| November 2025 | 11,942 |
| October 2025 | 14,251 |
| September 2025 | 14,888 |
| August 2025 | 16,424 |
| July 2025 | 17,975 |
| June 2025 | 17,633 |
| May 2025 | 17,408 |
| April 2025 | 20,750 |
| March 2025 | 17,806 |
| February 2025 | 11,968 |
| January 2025 | 12,317 |
| December 2024 | 12,451 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Storey Bend Solar plant, and when do they retire?
1 operable generator totals 74.5 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 75 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| STOS | Operating | Solar Photovoltaic | 75 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Storey Bend Solar plant?
EIA lists no joint owners for Storey Bend Solar. Storey Bend Solar, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Storey Bend Solar plant?
Storey Bend Solar is in Saint Cloud, Osceola County, Florida, at 28.2826° N, 81.0814° W. It sits in the Duke Energy Florida Inc balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Florida are similar in size?
Florida has 210 operable solar plants with 12,223 MW of capacity, and Storey Bend Solar's 74.5 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Columbia County Solar | Columbia | 75 | 194,714 |
| Gilchrist County Solar | Alachua | 75 | 199,909 |
| Harmony Florida Solar II | Osceola | 75 | 184,165 |
| Storey Bend Solar | Osceola | 75 | 184,346 |
| Cedar Trail | Baker | 75 | 178,300 |
| Swallowtail | Walton | 75 | 169,709 |
| Bronson Solar | Levy | 75 | 65,863 |
Source: EIA Forms EIA-860 and EIA-923, 2025.