Skip to main content
RateWatt

Solar power plant, Florida

Columbia County Solar power plant, Florida

Columbia County Solar is a 74.5 MW solar power plant in Columbia County, Florida, operated by FRP Columbia County Solar, LLC, and it generated 194,714 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 90th percentile of U.S. solar plants. By 2025 generation it ranks 2,534th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
30%Capacity factor, 2025, 90th percentile, on 74.5 MW net summer
0.1%Of FL generation, 2025
1 yearAverage generator age, by MW

How hard does the Columbia County Solar plant run compared with other solar plants?

The Columbia County Solar plant had a capacity factor of 30% in 2025 on 74.5 MW of net summer capacity, the 90th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 109 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Columbia County Solar30%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Columbia County Solar plant generating more or less than last year?

Columbia County Solar generated 194,714 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 28.0% behind the same months of 2025. 2024 has output for only 4 months, so the two years are not compared.

Net generation by period
PeriodMWh
202438,538
2025194,714
2026 through August101,333
2025, same months140,665
Monthly generation, Sep 2024 to Aug 2026
MonthMWh
August 20268,560
July 202612,088
June 202614,197
May 20269,276
April 202617,980
March 202616,400
February 202611,427
January 202611,405
December 202510,538
November 202512,619
October 202513,250
September 202517,642
August 202517,886
July 202519,303
June 202518,796
May 202520,011
April 202521,036
March 202517,987
February 202512,787
January 202512,859
December 202411,075
November 202412,205
October 202414,604
September 2024654

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Columbia County Solar plant?

Columbia County Solar made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 742nd largest of 7,223 solar plants. By 2025 generation it is the 68th largest of 313 generating plants in the state.

Columbia County Solar within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)194,714267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Columbia County Solar plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
COLSOperatingSolar Photovoltaic752024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Columbia County Solar plant?

EIA lists no joint owners for Columbia County Solar. FRP Columbia County Solar, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Columbia County Solar plant?

Columbia County Solar is in Fort White, Columbia County, Florida, at 29.8824° N, 82.7343° W. It sits in the Duke Energy Florida Inc balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Columbia County Solar's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Tupelo SolarPutnam75190,768
Bullfrog Creek SolarHillsborough75163,564
Gadsden County SolarGadsden75189,243
Columbia County SolarColumbia75194,714
Gilchrist County SolarAlachua75199,909
Harmony Florida Solar IIOsceola75184,165
Storey Bend SolarOsceola75184,346

Source: EIA Forms EIA-860 and EIA-923, 2025.