Natural gas power plant, Ohio
Central Utility Plant Cincinnati natural gas power plant, Ohio
Central Utility Plant Cincinnati is a 47.2 MW power plant, 45.3 MW of it natural gas, in Hamilton County, Ohio, operated by University of Cincinnati, and it generated 214,508 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Ohio, and its capacity factor sits at the 72nd percentile of U.S. natural gas plants. By 2025 generation it ranks 2,394th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Central Utility Plant Cincinnati plant run compared with other natural gas plants?
The Central Utility Plant Cincinnati plant's natural gas units had a capacity factor of 52% in 2025 on 46.5 MW of net summer capacity, the 72nd percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 191 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Central Utility Plant Cincinnati | 52% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its natural gas generators only. Values above 105% are left out of the comparison.
Is the Central Utility Plant Cincinnati plant generating more or less than last year?
Generation at Central Utility Plant Cincinnati fell 9.3% from 2024 to 2025, from 236,508 MWh to 214,508 MWh. Through August 2026 it is running 6.8% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 236,508 |
| 2025 | 214,508 |
| 2026 through August | 159,346 |
| 2025, same months | 149,155 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 26,132 |
| July 2026 | 27,710 |
| June 2026 | 24,652 |
| May 2026 | 22,158 |
| April 2026 | 16,297 |
| March 2026 | 16,109 |
| February 2026 | 12,504 |
| January 2026 | 13,784 |
| December 2025 | 8,961 |
| November 2025 | 11,023 |
| October 2025 | 21,059 |
| September 2025 | 24,310 |
| August 2025 | 25,260 |
| July 2025 | 26,214 |
| June 2025 | 25,278 |
| May 2025 | 21,133 |
| April 2025 | 15,670 |
| March 2025 | 11,131 |
| February 2025 | 11,354 |
| January 2025 | 13,114 |
| December 2024 | 15,829 |
| November 2024 | 14,061 |
| October 2024 | 19,705 |
| September 2024 | 22,925 |
| August 2024 | 24,696 |
| July 2024 | 24,547 |
| June 2024 | 23,728 |
| May 2024 | 21,664 |
| April 2024 | 14,524 |
| March 2024 | 18,808 |
| February 2024 | 17,933 |
| January 2024 | 18,087 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Central Utility Plant Cincinnati plant, and when do they retire?
4 operable generators total 47.2 MW, with an average age of 21 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 4 | 47 | 100% | none reported |
Every generator, 4 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CTG1 | Operating | Natural Gas Fired Combined Cycle | 12 | 2004 | n/a |
| CTG2 | Operating | Natural Gas Fired Combined Cycle | 12 | 2004 | n/a |
| P005 | Operating | Petroleum Liquids | 2 | 2004 | n/a |
| STG | Operating | Natural Gas Fired Combined Cycle | 22 | 2004 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Central Utility Plant Cincinnati plant?
EIA lists no joint owners for Central Utility Plant Cincinnati. University of Cincinnati operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Central Utility Plant Cincinnati plant use?
Central Utility Plant Cincinnati has capacity on 2 fuels: 96% natural gas and 4% petroleum. In 2025, natural gas made 99% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Natural gas | 45 | 96.0% | 212,652 |
| Petroleum | 2 | 4.0% | 1,856 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Central Utility Plant Cincinnati plant?
Central Utility Plant Cincinnati is in Cincinnati, Hamilton County, Ohio, at 39.1345° N, 84.5094° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Ohio are similar in size?
Ohio has 47 operable natural gas plants with 18,398 MW of capacity, and Central Utility Plant Cincinnati's 45.3 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Bowling Green Generating Station | Wood | 50 | 2,777 |
| Galion Generating Station | Crawford | 50 | 2,522 |
| Napoleon Peaking Station | Henry | 50 | 2,570 |
| Central Utility Plant Cincinnati | Hamilton | 45 | 212,652 |
| Bryan (OH) | Williams | 37 | 3,035 |
| O H Hutchings | Montgomery | 33 | 913 |
| West 41st Street | Cuyahoga | 32 | 0 |
Source: EIA Forms EIA-860 and EIA-923, 2025.