Natural gas power plant, Ohio

Central Utility Plant Cincinnati natural gas power plant, Ohio

Central Utility Plant Cincinnati is a 47.2 MW power plant, 45.3 MW of it natural gas, in Hamilton County, Ohio, operated by University of Cincinnati, and it generated 214,508 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Ohio, and its capacity factor sits at the 72nd percentile of U.S. natural gas plants. By 2025 generation it ranks 2,394th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

47.2 MWNameplate capacity
52%Capacity factor, 2025, natural gas units, 72nd percentile, on 46.5 MW net summer
0.1%Of OH generation, 2025
21 yearsAverage generator age, by MW

How hard does the Central Utility Plant Cincinnati plant run compared with other natural gas plants?

The Central Utility Plant Cincinnati plant's natural gas units had a capacity factor of 52% in 2025 on 46.5 MW of net summer capacity, the 72nd percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 191 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Central Utility Plant Cincinnati52%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its natural gas generators only. Values above 105% are left out of the comparison.

Is the Central Utility Plant Cincinnati plant generating more or less than last year?

Generation at Central Utility Plant Cincinnati fell 9.3% from 2024 to 2025, from 236,508 MWh to 214,508 MWh. Through August 2026 it is running 6.8% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024236,508
2025214,508
2026 through August159,346
2025, same months149,155
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202626,132
July 202627,710
June 202624,652
May 202622,158
April 202616,297
March 202616,109
February 202612,504
January 202613,784
December 20258,961
November 202511,023
October 202521,059
September 202524,310
August 202525,260
July 202526,214
June 202525,278
May 202521,133
April 202515,670
March 202511,131
February 202511,354
January 202513,114
December 202415,829
November 202414,061
October 202419,705
September 202422,925
August 202424,696
July 202424,547
June 202423,728
May 202421,664
April 202414,524
March 202418,808
February 202417,933
January 202418,087

Source: EIA Form EIA-923, through August 2026.

How much of Ohio's electricity comes from the Central Utility Plant Cincinnati plant?

Central Utility Plant Cincinnati made 0.1% of the 145,060,499 MWh reported by Ohio plants in 2025, from 0.1% of the state's 34,392 MW of capacity. By capacity it is the 78th largest of 215 plants in Ohio, the 3,921st largest of 14,327 in the U.S. and the 1,130th largest of 1,962 natural gas plants on its natural gas units alone. By 2025 generation it is the 53rd largest of 187 generating plants in the state.

Central Utility Plant Cincinnati within Ohio, 2025
MeasureThis plantOhioShare
Capacity (MW)4734,3920.1%
Generation (MWh)214,508145,060,4990.1%
Natural gas capacity (MW)4518,3980.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Central Utility Plant Cincinnati plant, and when do they retire?

4 operable generators total 47.2 MW, with an average age of 21 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s447100%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CTG1OperatingNatural Gas Fired Combined Cycle122004n/a
CTG2OperatingNatural Gas Fired Combined Cycle122004n/a
P005OperatingPetroleum Liquids22004n/a
STGOperatingNatural Gas Fired Combined Cycle222004n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Central Utility Plant Cincinnati plant?

EIA lists no joint owners for Central Utility Plant Cincinnati. University of Cincinnati operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Central Utility Plant Cincinnati plant use?

Central Utility Plant Cincinnati has capacity on 2 fuels: 96% natural gas and 4% petroleum. In 2025, natural gas made 99% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Natural gas4596.0%212,652
Petroleum24.0%1,856

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Central Utility Plant Cincinnati plant?

Central Utility Plant Cincinnati is in Cincinnati, Hamilton County, Ohio, at 39.1345° N, 84.5094° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Ohio are similar in size?

Ohio has 47 operable natural gas plants with 18,398 MW of capacity, and Central Utility Plant Cincinnati's 45.3 MW is 0% of that.

Natural gas plants in Ohio around this size
PlantCountyMW2025 MWh
Bowling Green Generating StationWood502,777
Galion Generating StationCrawford502,522
Napoleon Peaking StationHenry502,570
Central Utility Plant CincinnatiHamilton45212,652
Bryan (OH)Williams373,035
O H HutchingsMontgomery33913
West 41st StreetCuyahoga320

Source: EIA Forms EIA-860 and EIA-923, 2025.